Laserfiche WebLink
e <br /> ® 4e '1 Calvin. Giordano 8 Associates. Inc. <br /> E >< CE f• L ION i l S 0 l U 1 I J u i <br /> ® • 4D> S <br /> ® Deerfield Beach Hillsboro Blvd. (S.R.810) Roadway Corridor Improvements (Estimated <br /> ® Construction Cost $6.5M): (2007 - 2010) Engineer of Record/Contract Administrator, project included <br /> ® engineering design for reconstruction and improvements to approx. 4,800 linear feet of roadway (Hillsboro <br /> ® Boulevard/S.R. 810) from Federal Highway to S.R. A-1-A. Improvements included roadway cross-slope <br /> correction, underground utilities adjustments/relocations, drainage improvements, mast arm/ <br /> ® signalization, utility coordination and coordination of undergrounding utilities, safety improvements, <br /> ® landscape and streetscape elements, and decorative street lighting. <br /> • N.W. 12th Street (Estimated Construction Cost $4.8M): Miami-Dade County, FL, (2000-2002), West of <br /> I® N.W. 107th Avenue to East of N.W. 136th Avenue: Senior Project Administrator for the roadway <br /> ® construction and/or widening of a multi-lane divided section including bulkhead/seawall installation, <br /> culvert(s) extensions, roadway foundation stabilization (geo-textile installation), concrete barrier wall <br /> e installation, drainage, utility installations (water main and force main), railroad crossing modification, <br /> O signalization, roadway lighting, landscaping and irrigation,and pavement markings and signage. <br /> • N.W. 12th Street/HEFT Interchange (Estimated Construction Cost $5.6M): Miami-Dade County, FL, <br /> • (2000-2001), connection with the Homestead Extension of Florida's Turnpike (HEFT): Senior Project <br /> ® Administrator for the intersection connection of the mainline HEFT to N.W. 12th Street (excluding toll <br /> booth buildings) including ramp connections, two (2) flat slab bridges crossing Snapper Creek Canal, <br /> ® drainage improvements (including lake construction), concrete barrier wall, utility installations (water <br /> ® main, force main including aerial crossings, and lift stations), signalization, roadway lighting, landscaping <br /> eand irrigation,and pavement markings and signage. <br /> • Palmetto Expressway (S.R. 826/N.W. 167th Street) FDOT Milling and Resurfacing Projects <br /> • (Estimated Construction Costs $7.1M): Miami-Dade County, FL, (2000-2001), North of N.W. 154th Street <br /> to West of the Golden Glades Intersection: FDOT Senior Project Administrator for the milling and <br /> ® resurfacing of the mainline, ramps and adjacent frontage roads (N.W. 167th Street) and intersections for <br /> ® three (3) concurrent/adjoining FDOT projects. The work involved included milling and resurfacing, <br /> • concrete barrier wall modifications, signalization improvements/modifications, roadway lighting, <br /> overhead signage installation(s), pavement markings and signage, landscaping, bridge deck cleaning, and <br /> ® utility adjustments. <br /> • <br /> • <br /> • <br /> •• <br /> •• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> 0 <br /> ® RFQ#12-04-02,Civil/Environmental Engineering Page 312 <br />