<br /> ® Deerfield Beach Hillsboro Blvd. (S.R.810) Roadway Corridor Improvements (Estimated
<br /> ® Construction Cost $6.5M): (2007 - 2010) Engineer of Record/Contract Administrator, project included
<br /> ® engineering design for reconstruction and improvements to approx. 4,800 linear feet of roadway (Hillsboro
<br /> ® Boulevard/S.R. 810) from Federal Highway to S.R. A-1-A. Improvements included roadway cross-slope
<br /> correction, underground utilities adjustments/relocations, drainage improvements, mast arm/
<br /> ® signalization, utility coordination and coordination of undergrounding utilities, safety improvements,
<br /> ® landscape and streetscape elements, and decorative street lighting.
<br /> • N.W. 12th Street (Estimated Construction Cost $4.8M): Miami-Dade County, FL, (2000-2002), West of
<br /> I® N.W. 107th Avenue to East of N.W. 136th Avenue: Senior Project Administrator for the roadway
<br /> ® construction and/or widening of a multi-lane divided section including bulkhead/seawall installation,
<br /> culvert(s) extensions, roadway foundation stabilization (geo-textile installation), concrete barrier wall
<br /> e installation, drainage, utility installations (water main and force main), railroad crossing modification,
<br /> O signalization, roadway lighting, landscaping and irrigation,and pavement markings and signage.
<br /> • N.W. 12th Street/HEFT Interchange (Estimated Construction Cost $5.6M): Miami-Dade County, FL,
<br /> • (2000-2001), connection with the Homestead Extension of Florida's Turnpike (HEFT): Senior Project
<br /> ® Administrator for the intersection connection of the mainline HEFT to N.W. 12th Street (excluding toll
<br /> booth buildings) including ramp connections, two (2) flat slab bridges crossing Snapper Creek Canal,
<br /> ® drainage improvements (including lake construction), concrete barrier wall, utility installations (water
<br /> ® main, force main including aerial crossings, and lift stations), signalization, roadway lighting, landscaping
<br /> eand irrigation,and pavement markings and signage.
<br /> • Palmetto Expressway (S.R. 826/N.W. 167th Street) FDOT Milling and Resurfacing Projects
<br /> • (Estimated Construction Costs $7.1M): Miami-Dade County, FL, (2000-2001), North of N.W. 154th Street
<br /> to West of the Golden Glades Intersection: FDOT Senior Project Administrator for the milling and
<br /> ® resurfacing of the mainline, ramps and adjacent frontage roads (N.W. 167th Street) and intersections for
<br /> ® three (3) concurrent/adjoining FDOT projects. The work involved included milling and resurfacing,
<br /> • concrete barrier wall modifications, signalization improvements/modifications, roadway lighting,
<br /> overhead signage installation(s), pavement markings and signage, landscaping, bridge deck cleaning, and
<br /> ® utility adjustments.
<br /> •
<br /> •
<br /> •
<br /> ••
<br /> ••
<br /> •
<br /> •
<br /> •
<br /> •
<br /> •
<br /> •
<br /> 0
<br /> ® RFQ#12-04-02,Civil/Environmental Engineering Page 312
<br />
|