Laserfiche WebLink
0 <br /> ® ■BP(ie -,J Calvin, Giordano & Associates. Inc. <br /> Q e'C 1 E X C E P 1 I O N A L SOLUIIONS <br /> ® YYOO® <br /> 0 <br /> • RODERICK MYRICK, PE <br /> 0 Construction Observation/Inspection/Shop Drawings <br /> O SUMMARY OF QUALIFICATIONS <br /> O Mr. Myrick has 15+ years of transportation design-build, construction and emergency EDUCATION <br /> O response management experience in varying roles, his latest as responsible for business <br /> • development and the management of a construction engineering and inspection B.S.Civil Engineering, <br /> division. He has demonstrated his diverse skills in several areas and is willing to make University of Florida, 1996 <br /> 0 the tough management or technical decisions that are in the best interest of the client <br /> • and his firm. Mr. Myrick has excellent communication and technical skills and will add REGISTRATIONS <br /> immeasurable value to any project or team. Florida Professional <br /> 0 Engineer License No.: <br /> • PROJECT EXPERIENCE 56969 <br /> 0 Project Engineer- SR 90, US 41 Milling and Resurfacing, (12/2010 - 8/2011): The Florida Certified General <br /> project scope includes millings and resurfacing of a 4 mile stretch of US 41 in Collier Contractor License No. <br /> • County. This is a rural construction project which includes bridge traffic railing 1511653 <br /> 0 modifications, shoulder rework, asphalt, signalization, signing and pavement markings <br /> • and guardrail retrofits. Roderick is currently managing 3 project concurrently on this TRAINING AND <br /> assigned, an additional mill and resurface project and a design build urban ADA CERTIFICATIONS: <br /> • compliance project in the City of Naples. Reference: Eunice Usher, P.E. FMOC PN:M620725711660 <br /> • Operations In-House Construction Manager, (239) 656-7800 <br /> Senior Project Engineer- SR 5, US 1 Milling and Resurfacing, (11/2009 - 3/2010): Asphalt Paving Level 1 <br /> • The project scope includes millings and resurfacing of a 2 mile stretch of US 1 in Palm Earthwork Level 1 <br /> 0 Beach County. This is an urban construction project which includes minor widening, Earthwork Level 2 <br /> 0 pavement repairs, drainage and pipe lining, signalization, signing and pavement <br /> markings and landscaping improvement. Reference: Jacques Beaubrun - WPB Nuclear Surface Moisture <br /> Operations Construction Manager, (561) 719-7912 <br /> Density Certification <br /> • Senior Project Engineer- City of West Palm Beach, 24th and 25th Street, Streetscape DC Manager <br /> • Milling and Resurfacing, (11/2009 - 3/2010) The project scope includes millings and IMSA-WZTC Safety <br /> O resurfacing, watermain installation, lighting and decorative streetscapes on this Program <br /> ® Federally funded Local Agency Participation project. This is an urban construction Advance MOT <br /> project which included major public involvement and coordination with the <br /> • Department of Transportation. Reference: Brian Collins, PE 561.494.1040 Ext 2 WZTC Level 2-Traffic <br /> Safety in the Work Zone <br /> • Senior Project Engineer- SR 7, US 441 Reconstruction, (8/2008 - 3/2010). The Erosion Control and <br /> 0 project scope includes total reconstruction of the SR 7 corridor. This is a 25M urban <br /> Stormwater Management <br /> construction project which includes widening, milling and resurfacing, drainage, large <br /> 0 <br /> retention facilities, lighting, signalization and landscaping improvement. Reference: <br /> • Hassan Abedi, FTL Operations Construction Manager, (954) 958-7632 <br /> • Senior Project Engineer- SR 15, US 441 Reconstruction, (12/2004 - 08/2007). The <br /> 0 scope of this project included the reconstruction of the S-curve located along the SR 15 <br /> corridor in the City of Pahokee. Major items of work included: Community awareness <br /> O initiatives for complete roadway closures; subsoil excavation; Geo-synthetic soil <br /> 0 reinforcement (geo-grid); ARMI layer installation for the milling and resurfacing <br /> 0 sections; major culvert replacements and rip-rap installations in conjunction with AB <br /> Mattress operations. Reference: Deb Ihsan, WPB Construction Operations Manager <br /> • (561) 432-4966 <br /> 0 <br /> 0 <br /> O Page 31 28 <br /> 0 <br />