Laserfiche WebLink
09 <br /> 410 Calvin. Giordano & Associates, Inc. <br /> C.5 <br /> ` E X C E P T I O N A L SOLUTIONS <br /> ® T. <br /> ® Indication of How Long It Would Take to Implement Service After <br /> { Authorized to Begin: <br /> ® Calvin, Giordano & Associates, Inc. can commence work on any project immediately upon receiving the <br /> Notice to Proceed from the City of Sunny Isles Beach.The engineering staff assigned to this project has the <br /> ® capacity to begin immediately working on the project gathering as-builts and permits. Our survey <br /> ® department staff can place a crew in the field within 48 hours of receiving the Notice to Proceed to begin <br /> ® the design survey. From that point, all other services would follow uninterrupted. Based on our experience <br /> with these types of projects and more specifically our permitting experience with FDOT and Miami-Dade <br /> County on these types of projects, CGA would expect that our team would have an advantage with shorter <br /> ® length of time permitting and fewer RAIs than most other firms would. <br /> O <br /> 0 <br /> 0 <br /> 0 <br /> 0 0 <br /> 0 <br /> 0 <br /> cp <br /> 0 <br /> 0 0 <br /> • <br /> ® RFQ#12-04-02,Civil/Environmental Engineering Page 114 <br />-0 <br />