My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano - Planning & Urban
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Calvin Giordano
>
Calvin Giordano - Planning & Urban
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 11:07:38 AM
Creation date
2/2/2016 11:07:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® �0 <br /> Calvin. Giordano & Associates. Inc. <br /> t` \ E X C E f T ION A E SOLUTIONS <br /> 0 <br /> ® Sandra Lee,AICP, LEED AP BD+C,Page 2 <br /> ® PROJECT EXPERIENCE <br /> ® City of Marathon <br /> ® Provided the environmental planning services for the first several years after the City incorporated; gained <br /> in depth experience in implementing: <br /> 0 <br /> • Heightened habitat,wetland and shoreline protection measures; <br /> 0 • Transfer of development rights to protect sensitive habitat; <br /> ® • Clustering provisions to protect sensitive habitat; <br /> • Habitat Open Space overlays to protect sensitive habitat; and <br /> ® • Rate of Growth measures <br /> ® Compliance Monitoring Contracts <br /> Manage and conduct the 5-year compliance monitoring on the constructed mitigation sites for: <br /> ® • Blessed John XXIII Religious Facility: 6.72 acres of slough, marsh, and wet prairie habitat located <br /> ® among other mitigation sites <br /> ® • Memorial Hospital at Miramar: 51.08 acres of slough, marsh, wet prairie, and tree islands that is <br /> habitat to flamingo <br /> • Sheridan Ocean Beach Club III: 3.34 acres of marsh and tree island habitat <br /> ® • Isles at Weston: 64.55 acres of marsh with shallow channels and hydric islands which contains an <br /> ® archaeological site <br /> • Maple Ridge: 1.7 acres of Red Maple swamp with a dense fern understory in an urban setting <br /> ® • Berman Preserve: 28.4 acres of marsh, tree islands, slough, forested uplands, and forested <br /> wetlands <br /> • Pembroke Falls: 203.69 acres of forested wetland, marsh, hammock, and open water with <br /> ® documented Wood Stork feeding habitat <br /> • Miramar Pinelands: 31.9 acres of wetland restoration located on Broward County Park land at the <br /> ® historic head of the Snake Creek slough,contains open water and wet prairie habitat <br /> • Weston Increment III: 1,535 acres of sawgrass marsh, constructed refugia, and lake shelf habitat, <br /> ® documented utilization by wide variety of wildlife including the federally listed Snail Kite <br /> ® • Verizon Switch Station: 1.55 acres of marsh habitat with tree islands and 0.015 acres of open water <br /> ® • Pembroke Harbor: 31.2 acres of constructed wetland containing emergent marsh,tree islands, open <br /> water with a hydric berm separating the mitigation from an adjacent drainage canal <br /> 0 • Phillips Plat: 8.6 acres of tidally influences mangrove habitat recognized as a Local Area of <br /> ® Particular Concern by Broward County. The Site required the installation of flushing canals within <br /> ® the mangrove habitat, hand clearing of invasive species and the construction of a bermed <br /> freshwater storm water management area within the mangrove habitat <br /> ® Environmental Resource Permitting Projects <br /> 0 • Blessed John XXIII: Obtain ACOE, Broward County and SFWMD permits for the development site <br /> and the off-site mitigation area utilizing previously purchased mitigation conducted at Silver Lake <br /> ® along with newly constructed off-site mitigation. Provided the bidding services for the construction <br /> ® of the off-site mitigation area and managed the mitigation construction oversight and 5-year <br /> compliance monitoring/reporting. <br /> 0 • Orangetree Blossom/Miramar Pinelands: Coordinated permitting through the ACOE, Broward <br /> ® County and the SFWMD with mitigation plan components from multiple firms, tri-party agreement <br /> ® with County Commission approval for mitigation construction on County Park land. Provided the <br /> bidding services for the plant installation of the mitigation area and managed the mitigation <br /> ® construction oversight. <br /> 0 <br /> 0 Page 31 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.