My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ® CHEN:M00 RE <br /> ® isassocA*s <br /> Beach. The project encompasses approximately Monterra Development in Cooper City. Solano <br /> ® 24,000 LF of ROW infrastructure improvements Avenue was designed to create a relationship <br /> 0 including water main replacements, sanitary between the mixed-use residential, Town <br /> sewer upgrades, stormwater drainage Center, pedestrian walkways, parallel parking <br /> W improvements, paving & grading, streetscaping and green spaces to promote walkability, social <br /> • enhancements, landscaping improvements, interaction and give the area a sense of <br /> l- ighting improvements, and roadway community. This required a variance to reduce <br /> IF reconstruction. This project also required and relocate the required berm along the <br /> ® extensive coordination with the Public, adjacent property frontage to the roadways. Chen Moore <br /> CRAB, historic districts and various regulatory and Associates' services included roadway, <br /> B agencies. drainage, earthwork and utility design; <br /> ® government permitting including PMUD <br /> Pinecrest SW 79th Avenue Roadway rezoning; conducting public bidding for the <br /> ® Improvements. Chen Moore and Associates Monterra Community Development District <br /> $ provided professional engineering services for (CDD); construction observation and closeout <br /> ® the planning, design, and permitting of the services. <br /> roadway improvements to SW 79th Avenue and <br /> • SW 112th Street, including the reconfiguration Monterra Development - Cooper City <br /> ® <br /> of SW 79th Avenue between SW 110th Street University Drive Improvements. The Chen <br /> and SW 112th Street, the construction of a right Moore Team designed a new right turn lane and <br /> • turn lane extension from SW 112th Street onto bus bay from University Drive (FDOT SR 817) <br /> US-1, and the construction of drainage into the future entrance to the Town Center <br /> ® improvements to alleviate flooding concerns component of the Monterra Development in <br /> B along the project roadways. The reconfiguration Cooper City (north of Sheridan Street). The <br /> ® of SW 79th Avenue included the conversion of project required the design and construction of <br /> an existing bidirectional roadway into a one-way two - 9 foot box culverts (approximately 120 <br /> ® roadway and the construction of new sidewalk, LF), the demolition and relocation of +/- 2,000 <br /> ® curb and gutter, and a parallel parking lane LF of water main from Davie Utilities and <br /> along the west side of the roadway. doubled the width of +/- 2,000 LF of the <br /> ® existing Central Broward Water Control District <br /> ® Pinecrest SW Suncrest Drive Drainage (CBWCD) canal along University Drive. <br /> a Improvements. Chen Moore and Associates Coordination efforts were conducted with the <br /> W provided professional engineering services CBWCD, Town of Davie Engineering, Town of <br /> ® necessary for the design, permitting, and Davie Fire Marshall, Town of Davie Utilities, <br /> Ak construction of the stormwater drainage Cooper City Utilities, Broward County and the <br /> W improvements to Suncrest Drive. Florida Department of Transportation. The <br /> ® project was completed simultaneously with the <br /> ® Monterra Development — Cooper City University Drive Canal Expansion Project. Chen <br /> Solano Avenue Roadway Design and Moore and Associates' services included <br /> ® Construction Administration. Chen Moore roadway, drainage, earthwork and utility <br /> ® and Associates designed an over half-mile long design; government permitting; conducting <br /> roadway that connects Sheridan Street and public bidding for the Monterra Community <br /> ® University Drive, mixed-use residential areas Development District (CDD); construction <br /> ® and the Town Center component of the observation and closeout services. <br /> $ RFQ# 12-04-02 <br /> • Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> ® www.chenmoore.com <br /> 3.22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.