Laserfiche WebLink
PROJECT EXPERIENCE (CONT'D) <br /> Wooton Park Improvement, City of Tavares, FL — Project Manager. Coordinated and assisted the <br /> City staff with a conceptual plan of Wooten Park improvements. This included both upland and water <br /> related features. The goal is to make this a well utilized public park and facility, the "Jewel of Lake <br /> County" and surrounding areas. Met with potential park users to incorporate their ideas. Project <br /> includes boat ramp and channel access improvements, shoreline improvements, seaplane docking <br /> facility, docks, etc., coordinating efforts with regulatory agencies and City staff on resources, impacts <br /> and regulatory permits. <br /> Ed Stone Park Seawall Replacement, Volusia County, FL — Project Manager - Overall project <br /> strategy on replacing 122 ft. of cement-bag wall with an aluminum sheetwall to match the type of <br /> existing seawall along the rest of the shoreline. Coordinated all permitting issues with regulatory staff as <br /> well as, stormwater redesign with County Environmental staff. Provided City with cost estimation for <br /> design cost. This is a highly utilized park on the ST. Johns River and has been improved for greater <br /> utility by the public and fishermen. <br /> Smith's Creek Maintenance Dredging Project, City of Flagler Beach, FL — Project Manager. <br /> Project required complete engineering, permitting, and assisting City with securing funds to implement <br /> project. Provide navigation access by dredging 10,000 cubic yards from the Intracoastal waterway <br /> access channel to residential canals. Involved overseeing engineering design, technical specification <br /> and bid preparation, contractor selection, seawall and bank protection, prioritizing dredging based on <br /> funding, assisted in securing $165,000 in funding from the Florida Inland Navigation District, securing <br /> permit, and addressing resident concerns. <br /> Marsh Park Maintenance Dredging Project at Lake Yale, Lake County Water Authority, Lake <br /> County, FL — Project Manager. Provide navigation access from Park boat ramp to Lake Yale. Project <br /> designed to remove approximately 2,000 cubic yards of fined-grained, dominantly sandy sediments. <br /> Involved in site evaluation, sediment sampling, and securing permit. Coordinated with various agencies <br /> to ensure each entity's goals were met. <br /> Crane Creek Post-Dredge Assessment Project, St. Johns River Water Management District, FL — <br /> Project Manager. Evaluate the effectiveness of muck removal from crane creek. Identify and model the <br /> trapping efficiency and determine new material from watershed versus redistributed creek sediment <br /> within the dredged areas. This is a three-year ongoing study. <br /> Investigation and Demonstration of Beneficial Uses of Muck Sediment from the Indian River <br /> Lagoon, St. Johns River Water Management District, FL — Project Manager. Project involved the <br /> use and analysis of dredged sediments to demonstrate uses and potential uses of dredged sediments <br /> from the Indian River Lagoon Estuary. A public workshop was also conducted as a continuation of this <br /> project and has resulted in a better understanding in the need to dredge estuary creeks that are <br /> contributing sediments and impacting the water quality and benthic communities. <br /> Muck Deposit Assessment and Management Project, St Johns River Water Management District, <br /> Indian River Lagoon Program, FL — Project Manager. Goal of the project was to evaluate the <br /> feasibility of removing muck from the Eau Gallie River, Melbourne-Eau Gallie Causeway and South <br /> Banana River. Work tasks included dredged material management site investigations, zoning and <br /> engineering issues, long-term site management issues, and sediment removal, its management and <br /> cost analysis. <br /> ® Camino Court Maintenance Dredging Project, St. Lucie County, FL — Project Manager. Design <br /> and permit dredging of approximately 2,000 cubic yards of sediments from an canal within an aquatic <br /> preserve. Involved in site evaluation, sediment sampling, and securing permit. <br />