My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMC Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
DMC Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 1:59:21 PM
Creation date
2/2/2016 1:59:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> PROJECT EXPERIENCE (CONT'D) <br /> Daytona Beach Main Street Pier Restaurant Loading Evaluation, Daytona Beach, FL — Project <br /> Engineer. Responsible for substructure evaluation, logging of components, hardware and piling <br /> conditions. Report preparation and photo documentation. <br /> Sun Splash Park Seawall Extension & Stormwater Design, Daytona Beach, FL— Review Engineer. <br /> Coordination with staff to construct modifications to an existing seawall and stormwater maintenance <br /> system. <br /> Riverside Park Pier & Bulkhead Replacement Design, New Smyrna Beach, FL— Coastal Engineer. <br /> Assisted with design of approximately 1000 linear feet of bulkhead repair including deadmen <br /> replacement, epoxy injection of concrete sheet-pilings and cap replacement. Reviewed plans for <br /> constructability and provided complete cost estimation. <br /> Palatka Riverfront Park Improvements, Palatka, FL — Coastal Engineer. Assisted with design of a <br /> large floating dock addition capable of accommodating over 30 vessels and expansion of a boat ramp <br /> and accessory dock system. Reviewed plans for constructability and provided complete cost <br /> estimation. <br /> B-23 Canal Dredging and Seawall Repair, Port Orange, FL — Coastal Engineer. Reviewed plans for <br /> constructability, designed seawall repair components and provided in-field inspection of existing <br /> structures. Evaluated impacts to shoreline trees and compliance with City codes. <br /> ® Russell Property ADA Compliant Canoe & Kayak Launching Facility, Port Orange, FL — Project <br /> Engineer. Ensured all design work conformed to FDEP rules for construction of piers over and in <br /> Outstanding Florida Waters. Responsible for ensuing proper piling embedment and utility of launch to <br /> be as practical as possible for kayaks. <br /> Waterway and Canal Maintenance Dredging, Port St. Lucie, FL — Construction Inspector. <br /> Reviewed plans for constructability, coordinated with local residents to ensure public support, and <br /> inspected dredge material offload sites for feasibility. <br /> Taylor Creek Restoration Dredging, Phase 2, St. Lucie County, FL — Coastal Engineer. On-Site <br /> review of plans for constructability, feasibility and cost effectiveness. Coordinated all monitoring well <br /> locations at site with FDEP and generated a monitoring plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.