Laserfiche WebLink
ArocArc Surveying & Mapping, Inc. <br /> Jacksonville, FL <br /> Professional Hydrographers • Surveyors • Mappers <br /> ® BACKGROUND/ RESPONSIBILITIES <br /> RICHARD J. Mr. Sawyer is a Professional Surveyor and Mapper, as well as a ACSM Certified <br /> Hydrographer, with over 24 years of experience in large-scale design, marine <br /> SAWYER, P.S.M., engineering. and dredging surveys. . Mr. Sawyer offers to our client's dozens of <br /> years of experience and knowledge pertaining to the standards, technologies, and data <br /> C.H. presentation for charting of inland and coastal water bodies and their littoral land <br /> areas. His current resonsibilities include all facets of project management, field to <br /> PROJECT MANAGER finish, for surveying and mapping on large scale engineering design, geodetic, <br /> CERTIFIED coastal, marine, dredging and hydrographic mapping projects. <br /> HYDROGRAPHER PROJECT EXPERIENCE-2011 -2012 PROJECTS <br /> PLS <br /> • Cape Canaveral Port Authority, Cape Canaveral, Florida: Pre/Post <br /> dredging surveys. Topographic & Bathymetric expansion surveys <br /> EDUCATION • Panama Canal Authority, Coco Solo, Panama: Atlantic Jetty and canal <br /> Civil Engineering Technology; survey. Panama Canal widening and deepening <br /> Associates of Science(A.S.) • Manzanillo International Terminal, Colon, Panama: Multibeam swath <br /> Florida Community College: bathymetric and BlueView under dock sonar scan surveys for port <br /> 1989 <br /> expansion <br /> Shallow Water Mulitbeam Training, • New York Harbor, New York, NY: Sidescan and multibeam swath <br /> U.S and Canadian Hydrographic bathymetry of MV Victoria wreck site <br /> Commission. University of New • Indiana Harbor Remediation Dredging, East Chicago, Indiana: Pre- <br /> Brunswick.1996 dredge multibeam swath bathymetry, sub-bottom profiling and laser <br /> ® <br /> scanning of canal structures <br /> LICENSE AND/OR • US Virgin Islands Port Authority, St. Thomas & St. Croix, USVI: <br /> REGISTRATION Post-dredge and existing condition surveys of harbors for NOAA charting <br /> Florida Professional Surveyor& • Florida Department of Transportation: Scour surveys of 100 bridges <br /> Mapper (PSM)No. LS000613I along the Florida Intracoastal Waterway <br /> • Jacksonville Port Authority, Jacksonville, FL: Continuing services <br /> Amercian Congress of Surveying contract. Port expansion and maintenance dredging <br /> & Mapping,(ACSM CH)Certifed <br /> Hydrographer No. 194 <br /> AFFILIATIONS <br /> EXPERIENCE WITH ARC American Congress of Surveying and Mapping <br /> SURVEYING & MAPPING: U.S. Hydrographic Society <br /> 1 Years Florida Professional Surveying and Mapping Society <br /> TOTAL YEARS OF PROFESSIONAL TRAINING <br /> EXPERIENCE <br /> 24 Years • Shallow Water Mulitbeam Training, U.S and Canadian Hydrographic <br /> Commission. University of New Brunswick,1996 <br /> PERCENTAGE OF • Trimble Geomatics GPS Processing Training, Measuretronics, 2001 and 2004 <br /> AVAILABILITY • Side Scan Sonar Processing and Mosaicing, Oceananic Imagining Consultants, <br /> 2002 <br /> 50% • Microstatoin InRoads and Descartes Mapping Training, CADD Development, <br /> 1996. 1999,2003 <br /> • Hydrographic Data Acquisition and Processing, Coastal Oceanographics, Yearly <br /> ® from 1991-2006 <br />