My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> OVERSIGHT CEI FOR I-595 RECONSTRUCTION <br /> Client Florida Department of Transportation <br /> ® 3400 Commercial Blvd., Fort Lauderdale, FL <br /> ® Courtney Drummond, <br /> 954-486-1400 :=o <br /> 41 <br /> ® Completion: Ongoing • ff <br /> EYs � i ct. r 'f 'I <br /> ® Project Description: • • 11:4.4 <br /> ® This billion-dollar project will widen and „ _^ � t' ,. ,', h'�� <br /> resurface or reconstruct approximately - 1,;.?, "f& 1 <br /> ® 10'h miles of I- 595, adding three reversible d = ,['•f,` <br /> ®® tni <br /> Express lanes at-grade in the median, with : := "` r" <br /> variable-tolling features, from the 1-75 / <br /> ® Sawgrass Expressway to,east of the Turnpike Interchange. This project includes direct <br /> ® connections to median widening on the Turnpike, the addition of EB and WB auxiliary <br /> ® lanes to the outside of 1-595 and the SR84 frontage roads, braided ramps to provide <br /> ® grade separation betweenKon and off ramps in areas where conflicts and weaving <br /> movements presently exist, reconstruction of the Turnpike interchange and portions of <br /> ® the University Drive interchange, constructing a continuous connection of SR84 from <br /> ® Davie Road to SR7 in order to separate that traffic from 1-595, and new Sound Barrier <br /> ® Walls. <br /> ® Highlights of the major improvement components include: <br /> ® • Tolled reversible ground level express lanes to be,knovwn as, 595Express, serving <br /> ® traffic to/from I-75/Sawgrass Expressway from/to' east of SR 7, with a direct <br /> ® connection to Florida's Turnpike. <br /> ® • Geometric improvements to the 1-595 / Florida'1 -Turnpike Interchange. <br /> S .• Additional auxiliary lanes on the eastbound:and westbound 1-595 and SR 84 <br /> roadways. <br /> ® • Continuous connection of the SR 84 frontage road between Davie Road and SR 7. <br /> ® • Grade separated (braided) entrance and exit ramps. <br /> ® • Combined ramps and cross-road-bypasses. <br /> ® • Construction of the New River Greenway, a component of the Broward County <br /> Greenways System. <br /> ® • 13 sound barriers providing noise abatement for 21 communities. <br /> $ • Implementation of Bus Rapid Transit (BRT) / Express Bus Service within the 1-595 <br /> ® corridor. <br /> ® • Accommodation of a transit envelope within the corridor, currently under <br /> development as part of the Central Broward East-West Transit Analysis. <br /> ® r•r%oo A Irina rt 2-25 <br /> %•%.011 r% Is11v <br />
The URL can be used to link to this page
Your browser does not support the video tag.