Laserfiche WebLink
® City of Sunny Isles Beach • REQ No. 12-04-02-Traffic Engineering &Transportation Consulting <br /> ® mot o. <br /> (10 <br /> ® STAFFING <br /> 0 <br /> • The following is a matrix of the staff that will be responsible for this project. Mr. <br /> ® Mike Ciscar, PE, will be responsible for coordinating all work. <br /> ® YEAEMPLOYEE FIRM RESPONSIBILITIES XPERSOF <br /> EXPERIENCE <br /> ® <br /> ® Mike Ciscar, PE The <br /> roup Corradino Project Manager,Concept Design, Programming 24 <br /> Principal In Charge,Traffic Calming,Agency <br /> ® Joseph M.Corradino,AICP The Corradino Principal <br /> Condor Planning, Land Use, 19 <br /> Group Zoning, Master Plans, Parking,Transportation <br /> ® Favio Laverde, PE The Corradino Roadway Design,Traffic Calming Design, 10 <br /> ® Group Bidding, Inspections, Permitting <br /> ® Carlos Verson, PE The Corradino Roadway Design,Traffic Calming Design, 8 <br /> ® Group Bidding, Inspections, Permitting <br /> ® Marvin Guillen, El The Corradino Roadway Design,Traffic Calming Design, 23 <br /> ® Group Bidding, Inspections, Permitting <br /> ® Juan Sotero, PE The Corradino Roadway Design,Traffic Calming Design, 10 <br /> ® Group Bidding, Inspections, Permitting <br /> ® Alison Townsend,AICP The Corradino Feasibility Studies,Transportation Planning, 22 <br /> ® Group Parking,Transit Planning, Corridor Studies <br /> Ryan Solis-Rios, PE, PTOE The Corradino I Corridor Studies, Engineering Studies,Cost 11 <br /> ® Group Estimates <br /> ® Ted Stone The Corradino <br /> Group Corridor Studies, Feasibility Studies 39 <br /> ® Josh Bodes The Corradino GIS, Data Collection, Inspections 8 <br /> ® Group <br /> Andrew Davis The Corradino <br /> Group Data Collection, Inspections 6 <br /> ® Ed Perez, PE The Corradino <br /> Group Construction Inspection 26 <br /> 0 Richard Garcia, PE Richard Garcia& Data Collection 17 <br /> ® Associates <br /> Richard Garcia& <br /> ® Carlos Valentin, BSME Associates Data Collection Analyst 6 <br /> 0 m CI In A tltwtr% 3-1 <br />