® City of Sunny Isles Beach • REQ No. 12-04-02-Traffic Engineering &Transportation Consulting
<br /> ® mot o.
<br /> (10
<br /> ® STAFFING
<br /> 0
<br /> • The following is a matrix of the staff that will be responsible for this project. Mr.
<br /> ® Mike Ciscar, PE, will be responsible for coordinating all work.
<br /> ® YEAEMPLOYEE FIRM RESPONSIBILITIES XPERSOF
<br /> EXPERIENCE
<br /> ®
<br /> ® Mike Ciscar, PE The
<br /> roup Corradino Project Manager,Concept Design, Programming 24
<br /> Principal In Charge,Traffic Calming,Agency
<br /> ® Joseph M.Corradino,AICP The Corradino Principal
<br /> Condor Planning, Land Use, 19
<br /> Group Zoning, Master Plans, Parking,Transportation
<br /> ® Favio Laverde, PE The Corradino Roadway Design,Traffic Calming Design, 10
<br /> ® Group Bidding, Inspections, Permitting
<br /> ® Carlos Verson, PE The Corradino Roadway Design,Traffic Calming Design, 8
<br /> ® Group Bidding, Inspections, Permitting
<br /> ® Marvin Guillen, El The Corradino Roadway Design,Traffic Calming Design, 23
<br /> ® Group Bidding, Inspections, Permitting
<br /> ® Juan Sotero, PE The Corradino Roadway Design,Traffic Calming Design, 10
<br /> ® Group Bidding, Inspections, Permitting
<br /> ® Alison Townsend,AICP The Corradino Feasibility Studies,Transportation Planning, 22
<br /> ® Group Parking,Transit Planning, Corridor Studies
<br /> Ryan Solis-Rios, PE, PTOE The Corradino I Corridor Studies, Engineering Studies,Cost 11
<br /> ® Group Estimates
<br /> ® Ted Stone The Corradino
<br /> Group Corridor Studies, Feasibility Studies 39
<br /> ® Josh Bodes The Corradino GIS, Data Collection, Inspections 8
<br /> ® Group
<br /> Andrew Davis The Corradino
<br /> Group Data Collection, Inspections 6
<br /> ® Ed Perez, PE The Corradino
<br /> Group Construction Inspection 26
<br /> 0 Richard Garcia, PE Richard Garcia& Data Collection 17
<br /> ® Associates
<br /> Richard Garcia&
<br /> ® Carlos Valentin, BSME Associates Data Collection Analyst 6
<br /> 0 m CI In A tltwtr% 3-1