My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> • r <br /> • <br /> EAC Consulting,Inc. <br /> ® EAC Consulting, Inc. <br /> 815 NW 57th Avenue, Suite 402 <br /> ® Miami, Florida 33126 <br /> ® Phone:(305)265-5469 <br /> Fax:(305)264-5507 <br /> ® August 25, 2009 <br /> 0 <br /> ® Re: Miami-Dade County Children's Courthouse MUSP; RGA Project No.08-074 <br /> ® To Whom It May Concern: <br /> ® As the Project Manager for the referenced project, I have had the pleasure to team-up with the firm <br /> of Richard Garcia & Associates, Inc. (RGA). As a Sub-Consultant to our company, RGA has <br /> completed several tasks within the Traffic Engineering field (i.e. Data Collection, Traffic Impact <br /> Studies, etc) in an "Above Satifactory Manner of Workmanship". The services were performed <br /> ® in accordance within the project scope of services and schedule. <br /> Ott <br /> ® These traffic engineering services are part of the planning phase and do not include a construction <br /> ® cost. In closing, RGA provided an outstanding service and had the ability of communicating with <br /> exceptional professionalism throughout the life of the project. Should you need additional <br /> 0 information please do not hesitate to contact me. <br /> U <br /> ® Sincerely, <br /> ® EAC Consulting, Inc. <br /> • <br /> ® egoryA. Mendez, P.E. <br /> ® Project Manager <br /> d <br /> 6 <br /> ® <br /> CORK An 1A1O <br /> \.v r1r-�P11-0 11111 •16.05-5 <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.