My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ® City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> 0 <br /> RESPONSE TO DISPUTE DISCLOSURE FORM <br /> • <br /> • 19.2 HAS YOUR FIRM, OR ANY MEMBER OF YOUR FIRM, BEEN DECLARED IN DEFAULT, TERMINATED OR <br /> ® REMOVED FROM A CONTRACT OR JOB RELATED TO THE SERVICES YOUR FIRM PROVIDES IN THE <br /> ® REGULAR COURSE OF BUSINESS WITHIN THE LAST FIVE (5) YEARS? <br /> ® • Services for Crandon Park and services for Amelia Earhart Soccer <br /> ® Complex for the Miami-Dade County Park and Recreation Department. <br /> 0 Dispute between the parties as to the scope of services. <br /> Contracts terminated. <br /> ® • Follow-on engineering design and contract/construction administration <br /> services for a downtown-parking garage for the Fort Pierce <br /> ® Redevelopment Agency subsequent to conceptual, design. The agency <br /> ® decided to change the process to construction management at risk and <br /> ® contracted with a third party construction firm. <br /> • 19.3 HAS YOUR FIRM HAD AGAINST IT OR FILED ANY REQUESTS FOR. EQUITABLE ADJUSTMENT, <br /> CONTRACT CLAIMS, BID PROTESTS, OR LITIGATION IN THE PAST FIVE (5) YEARS THAT IS RELATED <br /> ® TO THE SERVICES YOUR FIRM PROVIDES IN THE REGULAR COURSE OF BUSINESS? <br /> ® Miami-Dade County vs. The Corradino Group, Inc. <br /> ® Claim or Cause of Action and Brief description of each Count for: <br /> • Amelia /' <br /> ® Breach of contract due to inactivity/lack of permits for Construction or <br /> ® Construction Administration <br /> • Crandon <br /> Counts I&II: Delays and lack of results related to installation and maintenance of <br /> ® AugerCast Piles <br /> 0 <br /> ® Count III: The systematic problems arising from an erroneous elevation for the <br /> ® foundation of the Dock Master Building <br /> ® Count IV: Delay and conflict arising from the design and Installation of a LULA <br /> ® elevator in the Dock Master Building <br /> 0 <br /> 0 <br /> 0 <br /> •—• <br /> 0 <br /> /1OO A M1A1!1 <br /> �.vr% r Ls, 1 I 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.