My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil - Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Bermello Ajamil
>
Bermello Ajamil - Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:42:20 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> k ' a Ilia <br /> • Bermello Ajamil & Partners, Inc. <br /> • <br /> • <br /> cI a1 <br /> • • <br /> _ " .".;17, 1) <br /> • c -_r' - ' . r ", 3 1 <br /> e�•/l1x • <br /> 3;•1.)01i rt` . <br /> • .• <br /> y��• \ <br /> • - l a - •__ 1/4c aural Perk cummui tneemet OI <br /> y= NOW OPEN <br /> NnoRAL mcros4at=- .zmromuu® 1J <br /> • iP > t e9 .11% . �i .: � > ir ,c•-.:-.:-.-:----;_,. cV <br /> 0 L. / •1 ,lt ,,,ip 'I <br /> pr . . <br /> • i -Ill <br /> O <br /> O ` a <br /> } <br /> • - - �:- - xt :-: %� <br /> 0 <br /> O Doral Park Bermello Ajamil & Partners. Inc. (B&A) was selected to provide <br /> ® Doral, Florida the design of this 14-acre neighborhood park situated in the City <br /> • of Doral. In designing the renovations, B&A hod to incorporate <br /> • Client:City of Doral both active and passive recreation facilities, working within the <br /> • Completion: 2007 confines of the existing site layout which included tennis courts, a <br /> Size: 14 Acres recreation building and a parking lot. <br /> • <br /> • The scope of work for the civil engineering component of this <br /> • project entailed providing coordination and design services as <br /> well as preparing construction documents for the median cut <br /> • along NW 102nd Avenue. the project consisted of providing <br /> • access to the redevelopment of Doral Park through a 4-lane <br /> • divided roadway and included the extension of a left turn lane, <br /> • closing an opening on the existing median and the provision of <br /> a new median cul for access to the park. The Civil Engineering <br /> • learn also led all permitting efforts associated with this project <br /> • with the relevant governing agencies. <br /> • <br /> 0 ,s <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.