|
•
<br /> O
<br /> O
<br /> O
<br /> O
<br /> O
<br /> Kirk J. Olney, RLA
<br /> ® Landscape Architect
<br /> O
<br /> ® Dade Boulevard Bike Path, Miami Beach, Florida' - Responsible for coordination of civil sub
<br /> consultant on seawall and seawall cap design. mangrove mitigation application, tree removal
<br /> O license application and pathway design for installation of an 8' wide bike path between County
<br /> ® right-of-way and a major ALOE brackish canal.
<br /> O SW 14th Avenue Streetscape Improvements, Delray Beach, Florida' - Responsible for coordination
<br /> with civil engineering prime consultant, coordination meetings with owner and landscape design
<br /> ® for reconstruction of 'V2 mile of roadway including on street parking, drainage improvements and
<br /> ® landscape.
<br /> O Catherine Strong Park,Delray Beach,Florida'- Responsible for client review meetings,plant selection
<br /> and specification; hardscape design, preparation of hardscape details, coordination with other
<br /> O design disciplines,preparation of opinion of probably cost and modifying design to keep proposed
<br /> improvements within budget and preparation of bidding documents for a ten acre passive and
<br /> O active recreation park with walking path, picnic pavilions, seating, interactive water play, tot lot/
<br /> playground,restroom building.parking and landscape.
<br /> O
<br /> ® Halpatiokee Regional Park,Martin County,Florida'-Responsible for field verification of existing trees;
<br /> ® coordination of civil sub-consultant;preparation of tree relocation plans:preparation of hardscape
<br /> construction drawings including fencing and paving details;preparation of landscape construction
<br /> ® drawings; provided construction observation services including supervision of tree relocation for a
<br /> l® 200 acre active and passive recreation park with five softball fields,five soccer fields,ten tennis courts,
<br /> O cover roller hockey rink. preserved wetland areas, .5 mile nature trail, three restroom/concession
<br /> buildings and parking.
<br /> ® Indian Riverside Park,Jensen Beach,Florida'-Responsible for bidding assistance;managed civil and
<br /> ® architecture sub-consultants;performed construction administration services including organization
<br /> O and documenting of bi-weekly meetings for a 30 acre passive park on Indian River Lagoon with 10.000
<br /> ® square foot community center, 1000' fishing pier,pedestrian pathway,landscape and parking.
<br /> O West Avenue/Bay Road, Miami Beach, Florida' - Prepared landscape construction drawings;
<br /> ® prepared bidding documents;assisted City staff during construction for drainage improvements to
<br /> O residential neighborhood including underground pumping station, new right-of-way cross section,
<br /> reconstruction of 2000 feet of roadway and new landscape;activities included managing civil sub-
<br /> consultant.
<br /> O NW 6th Avenue, Pompano Beach, Florida' - Developed conceptual design, created by others,
<br /> into construction drawings and coordinated with structural and civil engineer as well as irrigation
<br /> ® designer;prepared hardscape and landscape construction drawings for streetscape improvements
<br /> ® including new cross section. speciality pedestrian and vehicular paving, bus shelters, gateway
<br /> ® column features and landscape.
<br /> O Flamingo Park 2005 Emergency Hurricane Forestry Grant Application, West Palm Beach, Florida' -
<br /> ® Prepared grant application to reforest neighborhood after Hurricane Francis and Hurricane Jean;
<br /> ® activities include preparing grant application,field verification;base plan development;preparation
<br /> O of landscape construction drawings;monitored and reported on health of installed plants.
<br /> ® Charnow Park,Hollywood, Florida' - Performed construction management responsibilities including
<br /> ® weekly meetings with contractor and client,resolving conflicts between construction drawings and
<br /> ® filed conditions,nursery visits to tag plant material,field reports-preparation of sketches and drawings
<br /> ® as needed and coordination of other design discipline.The three acre park included pavilions, tot
<br /> lots and ploy grounds.tier seating with trellis and interactive water feature.
<br /> O
<br /> O
<br /> ® Cba D www.bermelloajamil.com
<br /> O 38
<br /> 0
<br />
|