Laserfiche WebLink
• <br /> O <br /> O <br /> O <br /> O <br /> O <br /> Kirk J. Olney, RLA <br /> ® Landscape Architect <br /> O <br /> ® Dade Boulevard Bike Path, Miami Beach, Florida' - Responsible for coordination of civil sub <br /> consultant on seawall and seawall cap design. mangrove mitigation application, tree removal <br /> O license application and pathway design for installation of an 8' wide bike path between County <br /> ® right-of-way and a major ALOE brackish canal. <br /> O SW 14th Avenue Streetscape Improvements, Delray Beach, Florida' - Responsible for coordination <br /> with civil engineering prime consultant, coordination meetings with owner and landscape design <br /> ® for reconstruction of 'V2 mile of roadway including on street parking, drainage improvements and <br /> ® landscape. <br /> O Catherine Strong Park,Delray Beach,Florida'- Responsible for client review meetings,plant selection <br /> and specification; hardscape design, preparation of hardscape details, coordination with other <br /> O design disciplines,preparation of opinion of probably cost and modifying design to keep proposed <br /> improvements within budget and preparation of bidding documents for a ten acre passive and <br /> O active recreation park with walking path, picnic pavilions, seating, interactive water play, tot lot/ <br /> playground,restroom building.parking and landscape. <br /> O <br /> ® Halpatiokee Regional Park,Martin County,Florida'-Responsible for field verification of existing trees; <br /> ® coordination of civil sub-consultant;preparation of tree relocation plans:preparation of hardscape <br /> construction drawings including fencing and paving details;preparation of landscape construction <br /> ® drawings; provided construction observation services including supervision of tree relocation for a <br /> l® 200 acre active and passive recreation park with five softball fields,five soccer fields,ten tennis courts, <br /> O cover roller hockey rink. preserved wetland areas, .5 mile nature trail, three restroom/concession <br /> buildings and parking. <br /> ® Indian Riverside Park,Jensen Beach,Florida'-Responsible for bidding assistance;managed civil and <br /> ® architecture sub-consultants;performed construction administration services including organization <br /> O and documenting of bi-weekly meetings for a 30 acre passive park on Indian River Lagoon with 10.000 <br /> ® square foot community center, 1000' fishing pier,pedestrian pathway,landscape and parking. <br /> O West Avenue/Bay Road, Miami Beach, Florida' - Prepared landscape construction drawings; <br /> ® prepared bidding documents;assisted City staff during construction for drainage improvements to <br /> O residential neighborhood including underground pumping station, new right-of-way cross section, <br /> reconstruction of 2000 feet of roadway and new landscape;activities included managing civil sub- <br /> consultant. <br /> O NW 6th Avenue, Pompano Beach, Florida' - Developed conceptual design, created by others, <br /> into construction drawings and coordinated with structural and civil engineer as well as irrigation <br /> ® designer;prepared hardscape and landscape construction drawings for streetscape improvements <br /> ® including new cross section. speciality pedestrian and vehicular paving, bus shelters, gateway <br /> ® column features and landscape. <br /> O Flamingo Park 2005 Emergency Hurricane Forestry Grant Application, West Palm Beach, Florida' - <br /> ® Prepared grant application to reforest neighborhood after Hurricane Francis and Hurricane Jean; <br /> ® activities include preparing grant application,field verification;base plan development;preparation <br /> O of landscape construction drawings;monitored and reported on health of installed plants. <br /> ® Charnow Park,Hollywood, Florida' - Performed construction management responsibilities including <br /> ® weekly meetings with contractor and client,resolving conflicts between construction drawings and <br /> ® filed conditions,nursery visits to tag plant material,field reports-preparation of sketches and drawings <br /> ® as needed and coordination of other design discipline.The three acre park included pavilions, tot <br /> lots and ploy grounds.tier seating with trellis and interactive water feature. <br /> O <br /> O <br /> ® Cba D www.bermelloajamil.com <br /> O 38 <br /> 0 <br />