Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> O <br /> • <br /> •• Randy P. Hollingworth <br /> • Director of Planning and Landscape Design Studio, Senior Associate <br /> • <br /> • Professional Design Experience <br /> • 'J. Randy Hollingworth has more than 30 years experience as an urban and landscape designer. His <br /> f' specialty is the design and development of mixed use projects and their integration within the <br /> • . s urban fabric. With a comprehensive understanding of the needs and requirements of various land <br /> • ,1 is r a uses, Mr. Hollingworth has prepared development plans for a wide range of project types. He has <br /> • developed master plans and design guidelines for commercial and retail areas, office parks and <br /> residential communities in numerous urban locations throughout Florida.In addition to his extensive <br /> • urban design and planning experience,Mr.Hollingworth has worked on o wide variety of landscape <br /> • _ design,public open space and streetscape oriented projects in the Southeast Florida area. <br /> • <br /> • PROJECT EXPERIENCE <br /> • James Archer Smith Park, Homestead, Florida - Project Manager responsible for the landscape <br /> • design of this underutilized neighborhood park. Since the existing facilities were underutilized and <br /> in deteriorated condition, the park was completely redesigned with all new facilities.The new plan <br /> • EDUCATION features multiple areas for recreation, both passive and active and a new feature in the park, o <br /> Master of Landscape <br /> • handicap accessible interactive water feature. Other amenities included additional on street <br /> Architecturearrd in Urban Design, <br /> • Harvard University. 1984 parking.two dog parks,two playgrounds and multiple picnic areas. <br /> • Bachelor of Landscape Palm Aire Park, Pompano Beach, Florida - Project Manager. Responsible for the conceptual and <br /> • Architecture,University of detail design for o new neighborhood park on the site of a former tennis center.The program was <br /> • Guelph. 1978 developed utilizing public workshops and numerous meetings with local neighborhood groups. <br /> • Recreational facilities and activities within the five acre park will include: tennis, basketball, sand <br /> • volleyball,bocce ball,racquetball, two playgrounds,an exercise fitness area, public restrooms and <br /> passive open space.Located adjacent to a large retention area and golf course,the site offers one <br /> • of the few public open spaces within the community for active and passive outdoor recreation. <br /> • <br /> • Wittkop Park Master Plan, Homestead, Florida - Project Manager responsible for the development of <br /> a master plan covering the redevelopment of this 2.5 acre park located in the City of Homestead. <br /> • Florida. The park includes two basketball courts,a tot lot and large playground area,a dog pork.two <br /> • handball courts,two tennis courts.a sand volleyball court and restroom focifities. The park also includes <br /> • an administration office for park employees,o snack bar and maintenance shed for storage. <br /> • Beach Plaza Redevelopment and Public Beach Revitalization Design,Pompano Beach,Florida - Project <br /> • Manager responsible for the landscape architectural design master plan associated with this project <br /> • consisting of the redevelopment plan for the only beachfront area of the City.The project scope <br /> • includes the planning and layout of public amenities and beachfront activities and streetscape and <br /> public open space design along Pompano Beach Boulevard. The"New"Pompano Beach Boulevard <br /> • and extension to Atlantic Boulevard will create dramatic gateways to the City's bench area.The City <br /> • has subsequently retained B&A to further develop the landscape plans and construction drawings <br /> • for the streetscape design of Atlantic Boulevard between Pompano Beach Boulevard and AIA. <br /> • The project entails a heavy public participation aspect regarding design concepts and input from <br /> residents of the area with several community workshops held to this effect. <br /> • <br /> • East Atlantic Boulevard Streetscape•Project Manager responsible for the conceptual planning and <br /> • detol design for a one block redevelopment of the streetscape on Atlantic Boulevard. Serving as <br /> the gateway to Pompano Beach,this most eastern block of the Boulevard was designed to provide <br /> • a more pedestrian friendly environment and encourage outdoor cotes and sidewalk retail activities. <br /> • On street parking along both the north and south sides of the block were incorporated into the plan <br /> • to assist in calming the vehicular traffic while providing easy access to the Beach.The design was <br /> • closely coordinated with the redevelopment of Pompano Beach Boulevard to provide a continuous <br /> theme and character to the redevelopment of the Beach area. <br /> • <br /> • <br /> • Cba > www.bermelloajamil.com <br /> • 42 <br /> • <br />