Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Jorge Ferrer <br /> • Director of Quality Control, Partner <br /> • <br /> • „` Professional Design Experience <br /> • Mr. Ferrer has over 20 years experience in architecture and interior architecture for a variety of <br /> r ''!�-`_ ~ clients, including government facilities, offices, porks, and hospitality facilities. He hos served as <br /> F. r. ro ect manager and project architect, coordinatingproject teams and engineering consultants <br /> • P 1 9 P IP 1 9 9 <br /> • 1 from project inception through implementation.One of Mr.Ferrers primary responsibilities is to ensure <br /> • that all projects developed at B&A go through our rigorous document review and coordination <br /> at process.He.along with his team of professionals,reviews all projects for completion,correctness and <br /> • compliance with established design criteria and governing codes. <br /> • 1 <br /> • <br /> PROJECT EXPERIENCE <br /> • Miami International Airport, MIA Mover Automated People Mover, Miami. Florida - As the Design <br /> • Review Coordinator for the Construction Services Team)FFCST),Mr.Ferrer leads a team of architects <br /> • and engineers performing design reviews of the design-build team's documents of the fixed facilities <br /> design of this$259 million project which includes the People Mover Station.Guideway and Traction <br /> • EDUCATION Power Sub-Station currently under construction. As the Owner's representatives. Mr. Ferrer and his <br /> Master of Architecture,• University of Honda. 1993 team reviewed all design and construction documentation including Architectural.MEP,Structural, <br /> • Civil and Landscape Architecture drawings. RFls,calculations,schedule, pay applications,waivers. <br /> • Bachelor of Architecture, and change orders. <br /> • University of Florida. 1986 <br /> Florida Department of Transportation (FDOT) District 4, Amtrak Station Historic Rehabilitation, Fort <br /> • Lauderdale. Florida-QA/QC.Performed quality control services associated with the Rehobilitation/ <br /> • Repair/Restoration of the Historic Ft.Lauderdale Amtrak Train Station in Broward County. <br /> • Miami-Dade Expressway Authority SR836, SR874 and SR112 ORT/DMS Gantries,Miami Florida-B&A <br /> • Project Manager and Designer responsible for the development of preliminary designs for the <br /> • proposed ORT and DMS gantries throughout the SR836,SR874 and SRl 12 corridors.This includes the <br /> • redesign/replacement of the award-winning existing Wing toll plaza on SR836 with a new signature <br /> gateway gantry spanning both East and Westbound lanes and exit ramp to 17th avenue.Numerous <br /> • <br /> signature designs were also generated for mainline and ramp gantries throughout the corridors <br /> • incorporating the proposed ORT and DMS systems. <br /> • Miami-Dade Expressway Authority(MDX)SR 836, East Bound Toll Plaza Design Consultant Services, <br /> Miami, Florida - Project Manager responsible for all phases of this project, from initial conceptual <br /> • design through construction phase. This award-winning facility is located on an existing expressway <br /> • and includes two AVI lanes,six toll lanes.a canopy,a service tunnel and a catwalk.Stainless steel and <br /> • aluminum cladding provided MDX with the advantages of off-site prefabrication,rapid construction <br /> • and installation and minimum disruption for the public during this construction process. <br /> • Miami-Dade Expressway Authority(MDX)Headquarters,Miami,Florida-Project Manager responsible <br /> • for all phases of this project,from initial conceptual design through construction phase. This award- <br /> winning 14,000 SF building was designed to house a state-of-the-art traffic center.a boardroom and <br /> general office space.The existing one-story building was modified to create a gateway into the new <br /> • building and operated uninterrupted during construction. <br /> • <br /> • Miami-Dade Water And Sewer Department Headquarters Facility,Miami, Florida-Project Manager <br /> responsible for all phases of this project, from initial conceptual design through construction phase. <br /> • B&A served as Design Criteria Professional for the $30 million headquarters facility comprised of a-5 <br /> • story office building and a 10-story parking garage.Responsibilities included consolidating numerous <br /> • department divisions that were spread throughout the county. <br /> • Miami-Dade Water And Sewer Department LeJeune Office Building, Coral Gables, Florida - <br /> ® Project Manager responsible for programming. spoce planning, construction documents, and <br /> • construction administration services for 58,000 SF building. Responsibilities include coordination <br /> • Cj D www.bermelloajamil.com <br /> • 57 <br /> • <br />