My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 3:57:38 PM
Creation date
2/2/2016 3:57:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> FDEP PREAPPROVAL PETROLEUM CLEANUP PROGRAM <br /> I <br /> I RELEVANCE TO REQUIREMENTS: <br /> • Underground storage tank management • Remedial action <br /> • <br /> • Interim remedial action ■ Cost estimation <br /> ■ Contamination assessment ■ Specifications <br /> • Soil and groundwater assessment ■ Bid preparation <br /> • Remedial design ■ Construction <br /> _ ■ Operation and maintenance ■ Closure <br /> 0 <br /> I As a certified contractor for the State of - . •=r <br /> Florida's preapproval petroleum cleanup ,. y, i•^ y Ats <br /> program, ECT is responsible for conducting r ��� ,�%, ; ti <br /> ' site assessments, remedial actions, operations ' 1 - ,. . _t - - <br /> C.9 <br /> and maintenance (O&M), and closures at sites \ , j° ' -- T V <br /> with petroleum impacted soil and groundwater a.- +. ... te.�_ --� '- <br /> I throughout Florida. Contamination assessment �_ 3 kr•'?T -lath <br /> ;��ir <br /> activities involve defining the horizontal and <br /> vertical extent of contamination across a site ° - - -- - - --- <br /> I and adjoining sites utilizing monitoring well <br /> drilling (mud rotary, hollow stem augers, sonic, <br /> direct push technologies) and in situ analyses ,p` ` .‘I with portable field instruments (organic vapor ".... <br /> analyzer, field gas chromatograph, etc.). Remedial action activities include the development of <br /> remedial action plans, design, construction, and O&M of soil and groundwater remedial systems <br /> I tailored to cleanup select constituents of concern. These remedial systems include soil vapor <br /> extraction, groundwater pump and treat, air sparging, multi-phase extraction, bioremediation, hydrogen <br /> peroxide injection, Dynamox (oxygen <br /> I1 <br /> I <br /> injection in solution), and other newly <br /> developed technologies. Site closure is the <br /> ultimate goal of the program. <br /> 1 _ r, <br /> 1111 <br /> Currently, ECT is conducting or has <br /> l •,t'y'};r' �+ - • ,(t. ;L'- completed interim remedial actions, site <br /> `�. <br /> f,+ .} .. 6 ` assessments, contamination assessments, <br /> e ' 'ci remedial action plan preparation and <br /> #Theal design, installation of remediation systems, <br /> Iirr' operation and maintenance, sampling and <br /> ;E 'tb� 1 - " . • - fiv analyses, and cleanup and closure services <br /> -,... ='--c.-• at over 800 sites. <br /> I <br /> I <br /> Z r PROJECT PROFILE O <br /> CWUSERSUYAXGIAPPDATAU MSI LNICROSOFTRINDOWSIT EMPORARY L\TFR.NET FILESCO.V IE.\T.OUIl DOK\O1NSG7QX SUMSLPROJ.DOC-0f 3012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.