My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 3:57:38 PM
Creation date
2/2/2016 3:57:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> O LARRY J. DANEK, Ph.D. <br /> Principal Scientist/President <br /> Project Assignment: Principal-in-Charge <br /> Project Director; Flow Monitoring and Data Collection, St. Johns River <br /> Water Management District (SJRWMD)—Designed and installed an auto- <br /> mated sampling system to monitor water flow and nutrient loading at Hatchett <br /> Creek and Little Hatchett Creek outfalls into Newnans Lake and unnamed <br /> tributaries to Lake Lochloosa. Used refrigerated ISCO® samplers for collec- <br /> tion of samples. The sites were equipped with a telemetry system to notify per- <br /> Education sonnel when a sampling event occurred. <br /> Ph.D., Physical Sciences— <br /> University of Michigan. 1976 Project Director; Environmental Services Support for Southwest Florida <br /> M.S.. Physical Sciences— Water Management District (SR'FWMD)—Responsible for assisting the <br /> University of Michigan. 1973 project manager and other technical staff to ensure the District is provided top <br /> B.S..Geological Oceanography— quality personnel to provide development and reviews of watershed manage- <br /> University of Michigan. 1972 ment plans. NPDES. and other permit reviews. QA/QC of data. and review of <br /> engineering designs for water resource projects. <br /> Project Manager; Environmental Sen•ices Support for SJRWMD- <br /> Affiliations Responsible for assisting project managers and other technical staff to assure <br /> Southern Environmental Business the District is provided top quality personnel for modeling. permit reviews. <br /> Council GIS data management. watershed management plans. and other positions re- <br /> Florida Lake Management Society quested under the contract. Works with Human Resources to recruit new per- <br /> Tau Beta Pi sonnel. as needed. <br /> Project Director; Flow Monitoring and Data Collection; SJRWMD— <br /> Designed and installed sampling station for monitoring of tributaries to Lake <br /> Areas of Specialization Harney using automated and refrigerated ISCO®samplers. <br /> Project Management. Water <br /> Resource Engineering. Physical Project Manager; Orange Lake Studies, SJRWMD—Supervised the com- <br /> ' Sciences. Hydrology. Mixing <br /> Zones. Limnology.Oceanography. pletion of a series of diagnostic studies to assess the role sediments play in the <br /> nutrient budget. primary productivity, and trophic state of the 16.400-acre Or- <br /> Water Quality. Impact Assessment ange Lake. Crucial information included water depth. depth and physical na- <br /> ture of the sediments, and areal coverage and species composition of the float- <br /> ing and emergent vegetation in Orange Lake. The data collected during these <br /> surveys were used to prepare a bathymetric map and cross sections of Orange <br /> Lake. sediment isopach maps. maps of vegetation type and cover. and tabula- <br /> tions of sediment characteristics. <br /> Project Director; Dog Branch-Edgefield Regional Stormwater Treatment <br /> System, SJRWMD—Participated in the management and design of a planting <br /> ' plan for a 56-acre stormwater treatment facility. The system was designed to <br /> utilize plants to remove phosphorus. nitrogen. and sediment from agricultural <br /> pollution sources and polish the stormwater prior to release into the St. Johns <br /> 1 River near Palatka. <br /> Principal-in-Charge; Science and Engineering Support Sen-ices, <br /> SFWMD—Responsible for assisting project manager and other technical staff <br /> to ensure the District is provided top quality personnel to work in the District <br /> office on water resource engineering, data collection, and QA/QC projects. <br /> Works with Human Resources to recruit personnel,as needed. <br /> Project Manager; East Gainesville Depot Park Brownfields Redevelop- <br /> mendStormwater Park Program, Gainesville Regional Utilities/City of <br /> Gainesville—Responsible for management and administration of a project to <br /> remediate coal tar and other hazardous contaminants from a brownfield site <br /> near downtown Gainesville and redevelop the site as a regional stormwater <br /> park. A regional stormwater treatment basin has been designed to provide <br /> MSC S0Environmental <br /> Considen4 S Technokgy,re P.\PAUL YAN&,CI Y OF SUNNY ISLES\APPENDICISIRESUSIES SUNYISIS.DOC-43012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.