Laserfiche WebLink
I <br /> LELAND A.I SMITH, P.E., D.WRE <br /> O }::- �_ _r- Senior Engineer <br /> Project Assignment: Civil Engineering <br /> IEngineer of Record/Project Manager; Tower Road Stormwater Manage- <br /> Education ment Facility (SWMF) Basin Study, Leon County Public Works— <br /> M.S..Civil Engineering—Florida Conducted an evaluation of the performance of an existing. unpermitted (pre- <br /> I <br /> State University. 2009 rule)SWMF receiving runoff from a 110-acre residential area with a history of <br /> flooding problems. Designed minor improvements to the drainage network as- <br /> B.S..Civil Engineering—Florida <br /> sociated with the SWMF and provided recommendations for actions necessary <br /> State University. 1991I <br /> for the County to obtain an SWMF operating permit. <br /> Peer Reviewer; Depot Park Stormwater Management Facility and Pump- <br /> ing Station, City of Gainesville—Provided engineering technical review of <br /> I Registrations <br /> Diplomate.Water Resources construction documents for constructability of a new, lined wet detention <br /> SWMF and associated stormwater pumping station to manage and treat <br /> Engineer. American Academy of stormwater runoff from an 89-acre urbanized drainage area, as part of a 32- <br /> I Water Resources Engineers. acre Brownfield restoration project in downtown Gainesville. Florida. The res- <br /> No. 00512 toration project includes site remediation and redevelopment as a stormwater <br /> Professional Engineer, Florida, park. with landscaping. multi-use trails, a museum, and other amenities. <br /> No. 50794 p g' <br /> I <br /> Professional Engineer.Georgia. <br /> No. 30543 Engineer of Record; Site Civil Design and Permitting Services for Bagley- <br /> to-Graceton 230-kV Transmission Line Rebuild, Baltimore Gas & Elec- <br /> Professional Engineer. Alabama. tric (BG&E)—Provided civil engineering design services for access roads. <br /> No. 30965-E <br /> ' tower construction and demolition working areas, and associated best man- <br /> Professional Engineer. Idaho. agement practices for stormwater management and sediment and erosion con- <br /> No.9319 trot for a I4-mile power transmission corridor in Harford County. Maryland. <br /> Professional Engineer.Maryland. <br /> iNo.40132 Project Engineer; Site Civil Design and Permitting Services for Graceton- <br /> Professional Engineer. Ohio. to-Conastone 230-kV Transmission Line Upgrade, BG&E—Provided civil <br /> No. 75594 engineering consultation services in pre-design phase of this project. which in- <br /> NCEES Model Law Engineer, volved design and permitting of access roads. line replacement working areas. <br /> IRecord No. 17191 and associated best management practices for stormwater management. and <br /> Georgia SWCC Certified Level II sediment and erosion control. for an 8.5-mile power transmission corridor in <br /> Design Professional. No. 937 Harford County.Maryland. <br /> IEngineer of Record/Project Manager; Avenue C North Drainage Im- <br /> Affiliations provements for the City of Carrabelle—Provided construction grant appli- <br /> t American Society of Civil cation,engineering design. permitting, bidding and construction phase services <br /> for retrofit of existing drainage infrastructure located in the City of Carrabelle <br /> Engineers to address localized flooding and sediment control issues. Improvements in- <br /> Florida Stormwater Association eluded: (I) replacement of an existing dry detention pond. previously permit- <br /> 1 Florida Water Environment <br /> Association ted to serve a 7-acre drainage area, with a larger wet detention pond to treat <br /> runoff from a 27.5-acre urbanized contributing area: (2)retrofit of an existing. <br /> Tau Beta Pi sediment-filled cross-drain with a sediment trap: and (3) stabilization of up- <br /> Istream scour-prone areas to reduce erosion and sedimentation. <br /> Areas of Specialization Engineer of Record/Project Manager; CR-30A Drainage Improvements <br /> Project Manager and Engineer of for the City of Carrabelle—Provided construction grant application. engi- <br /> I Record for General Civil and Water neering design. permitting. bidding and construction phase services for re- <br /> placement and hardening of a failing double 60-inch cross-drain. headwall and <br /> Resources Projects: Preparation of endwall system. stabilization of erosion prone areas, and creation of a <br /> Plans and Specifications: quiescent pool upstream from the cross-drains to provide for erosion control <br /> I Construction Phase Services: and sediment removal. <br /> Shipboard Engineering Systems: <br /> Technical Training Project i\lanager/Project Engineer; Preliminary Civil Engineering and <br /> I Planning Services for New Medical Facility, Wentworth Building Corpo- <br /> ration—Comprehensive planning-level site development services for the re- <br /> development of an historic plantation property to construct a new medical fa- <br /> & n <br /> Consulthg&roch^cdwR Inc. PAPAUL YA.NG'CtrY OF SUNNY ISiiSNAPPEsDICF_S1RF_SmIFS SUNYISLS.Ooc 43x12 <br />