|
CONTINUING PROFESSIONAL d
<br /> dddddl dl l
<br /> I>1 ARCHITECTURAL & ENGINEERING SERVICES • o," -'z. �'%de %
<br /> o. ♦ .uddd1
<br /> FIRMS ONLY (CCNA) RFQ NO. 12-04-02 i 441
<br /> TRAFFIC & TRANSPORTATION ENGINEERING ,--°' CSAGQ��';;
<br /> //AAA/A WA
<br /> Carlos ueta, P.E. �••)
<br /> TRAFFIC CONTROL
<br /> 00
<br /> I Mr. Sarasqueta has 11 years of experience in design, mostly responsible for the coordination and CSA Group
<br /> preparation of transportation projects, in both the public and private sectors. His technical
<br /> expertise ranges from the design of roadway alignments, plans preparation to FDOT standards,
<br /> I and the specialized use of MicroStation and GEOPAK software, to the development and Education:
<br /> implementation of traffic control concepts, preparation of specification packages, quantity B.S. Construction
<br /> computations, estimates and development of project schedules with the use of Primavera Engineering
<br /> software. Universidad Nacional
<br /> de La Plata,
<br /> Relevant Experience Argentina, 2001
<br /> City of Miami Civil Engineering for Roadway Projects, Miami-Dade County, FL — Responsibilities
<br /> I included the development of scopes for several projects comprising cost estimates, field Registrations:
<br /> inspections and evaluation of site conditions. Professional Engineer
<br /> Florida No. 64058
<br /> L Districtwide Miscellaneous PE Design, Miami-Dade County, FL — Project Engineer to assist the
<br /> Department in preparing a set of contract plans to be used by a selected contractor and include
<br /> project elements for roadway, signing and pavement markings, signalization, lighting,
<br /> landscaping and right-of-way services for the Department. Consul-Tech will provide design,
<br /> 0 drainage analysis, design and right-of-way surveys, environmental services, field investigations,
<br /> geotechnical, utility adjustment plans, signalization, structural, lighting and landscape plans for
<br /> roadways, structures, minor bridge design, intersections, and interchanges.
<br /> 0 • S.W. 107th Avenue, Miami-Dade County, FL — Project Engineer performing signing and
<br /> pavement marking design for roadway milling and resurfacing project consisting roadway and
<br /> drainage design, lighting, signalization, surveying, utility coordination, landscaping and public
<br /> 0coordination. The project also includes improvements associated with ADA requirements.
<br /> • S.W. 57th Avenue from Coral Way to Tamiami Trail, Miami-Dade County, FL — Project
<br /> Engineer for milling and resurfacing from SW 8th Street to SW 24th Street. Drainage analysis
<br /> 0 and improvements was included within the same limits. Intersection improvements at SW 8th
<br /> Street & SW 24th Street will also be improved to increase capacity. Performed signing and
<br /> pavement marking design. Other features also included roadway design and right-of-way
<br /> 0 surveys, field investigations, utility adjustment plans, signalization, lighting, landscape plans,
<br /> and sidewalk upgrades.
<br /> • Mile Marker 30 Scramble Lanes (Big Pine Key), Monroe County, FL — Project Engineer for
<br /> 0 milling and resurfacing project including the addition of a paved median or two-way left turn
<br /> lane to the existing two-lane and three-lane undivided roadway sections of SR 5 (US 1) /
<br /> Overseas Highway. The limits of the improvements begin just south of the intersection of
<br /> Ships Way and extend north to Key Deer Blvd. (approx. 0.933 mile).
<br /> 0 City of Sweetwater from S.W. 4th Street & S.W. 105'" Place, Miami-Dade County, FL — Project
<br /> Engineer responsible for the design of improvements to the street system of the City of
<br /> Sweetwater including milling and resurfacing, sidewalk replacement and ADA compliance.
<br /> 0
<br /> Design elements included roadway design, drainage, signing and pavement markings,
<br /> signalization, lighting, landscaping and right-of-way.
<br /> 0 FEMA Program, Miami-Dade County DERM, Miami-Dade County, FL — Responsibilities within
<br /> this project consisted in maintaining the program schedule with the use of Primavera software
<br /> for five master consultants associated with the program.
<br /> S.R. 90/S.W. 8th Street from S.R. 821 (HEFT) to S.R. 826 (Palmetto Expressway), Miami-Dade
<br /> I
<br /> County, FL - Project Engineer for milling and resurfacing project that includes safety
<br /> improvements, ADA upgrades, and additional safety upgrades at the intersections of S.W. 92nd
<br /> Avenue, S.W. 102nd Avenue to S.W. 99th Place, and S.W. 109th Avenue. Scope of work
<br /> U includes upgrade provisions for Turbo Lanes at the intersection of S.W. 102nd Avenue.
<br /> Gtm
<br />
|