|
CONTINUING PROFESSIONAL Aaee®eiaAi
<br /> I>
<br /> ARCHITECTURAL & ENGINEERING SERVICES i - !. *A%'%
<br /> FIRMS ONLY (CCNA) RFO NO. 12-04-02 4 ��:
<br /> TRAFFIC & TRANSPORTATION ENGINEERING -- CSA Group""
<br /> aw.,
<br /> .'Id AAAA! .144444
<br /> I Adriana
<br /> •
<br /> TRAFFIC ENGINEERING �.:♦O0
<br /> I
<br /> CSA Group
<br /> Ms. Rodrioguez has over 10 years experience in traffic safety, transportation planning, and traffic
<br /> operations design, including signalization. Adriana is experienced working on traffic safety and
<br /> traffic operation contracts for FDOT's Districts Four and Six. She has prepared several traffic Education:
<br /> I condition evaluations, traffic safety reviews, traffic simulation, operational analyses, access M.S. Civil Engineering
<br /> management, parking studies, and multi-modal transportation impact analyses. She has also Florida International
<br /> been responsible for the design of pedestrian crossing signals, school zone flashing beacons, University
<br /> ' signal design, signal modification plans, and Maintenance of Traffic plans. 2004
<br /> Relevant Experience B.S. Civil Engineering
<br /> 1 Districtwide Traffic Operations Studies Contract, FDOT, District Six (June, 2008 — June, 2013) Javeriana University
<br /> Transportation Engineer/Project Manager who manages the resources assigned to each task work 1995
<br /> order and performs QA/QC on task deliverables as part of the contract. This task work order
<br /> driven contract includes the development of safety and traffic engineering study types. Client Registrations:
<br /> 1 PM: Yerily Diaz: (305) 470.5311 Professional Engineer
<br /> Florida No. 67394
<br /> Districtwide Safety/Traffic Operations Contract, FDOT, District Six (March, 2007 — March, 2012) 2008
<br /> ISenior Transportation Engineer/Project Manager who manages the resources assigned to each
<br /> task work order and performs QA/QC on task deliverables as part of the contract. This contract Professional Traffic
<br /> includes the development of safety and traffic operation study types. Client PM: Jankristof Operations Engineer
<br /> ' DeVastey: (305) 470-5339 Florida No. 2813
<br /> 2010
<br /> Miami-Dade County Water and Sewer Department (Utilities Design Section), Miami, FL -
<br /> Transportation Engineer who prepared traffic impact study in support of a Maintenance of Traffic
<br /> IPlan for the installation of a 36-inch Force Main along SR-985/NW 107 Avenue from West
<br /> Flagler Street to NW 7 Street. This effort included traffic control analyses for determining overall
<br /> phase planning, lane closure analysis, detours, diversions, and creating any miscellaneous traffic
<br /> control sheets. PM: Carlos Benavides: 786.268.52855
<br /> Lauderhill City Center DRI, New Lauderhill Management, LLC, Lauderhill, FL - Conducted
<br /> existing conditions, traffic forecasting, traffic assignment, network operations, roadway
<br /> improvements, and multi-modal transportation impact analyses to complete Question 21 —I
<br /> Transportation in the DRI/ADA application for the proposed Lauderhill City Center, located in a
<br /> Transit Oriented District.
<br /> rnSR-93 (I-75)/Pembroke Road Interchange PD&E Study, Pembroke Pines, FL - Assisted and
<br /> performed all technical analyses associated with the documentation and traffic forecasting for
<br /> the Project Development and Environment (PD&E) Study for the I-75/Pembroke Road
<br /> Interchange. Project also involved in the Interchange Justification Reports (IJR's) preparation for
<br /> Ithis project.
<br /> SR-7 Fast Bus, Phase II, Fort Lauderdale, FL - Participated on the evaluation of a fast bus
<br /> system along SR-7 in Broward County and evaluated the feasibility of implementing bus queue
<br /> IIjumpers along the SR-7 fast bus corridor.
<br /> Dorsey Riverbend Neighborhood Enhancement Project, City of Fort Lauderdale, FL - Traffic
<br /> engineer who participated in the revision and evaluation of the traffic calming strategies
<br /> IIproposed for the Dorsey Riverbend neighborhood. The calming strategies included the evaluation
<br /> of enhancement projects such as, gateway entry signs, roundabouts, on-street parking,
<br /> pedestrian-scale lighting, drainage improvement, and landscaping.
<br /> IIIIntersection of SW 18 Avenue and Stirling Road - Signal Modifications, City of Dania Beach, FL
<br /> Engineer of Record for the signal modification design of the existing traffic signal at SW 18
<br /> Avenue and Stirling Road. The signal required modifications due to the addition of an exclusive
<br /> O
<br /> westbound right-turn lane at the intersection.
<br /> i Page 29
<br />
|