My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSA Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
CSA Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 4:40:44 PM
Creation date
2/2/2016 4:40:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTINUING PROFESSIONAL °d°e,,,,'; <br /> II>, ARCHITECTURAL & ENGINEERING SERVICES �•° "`" ' <br /> 4444 A. <br /> ,444 <br /> FIRMS ONLY (CCN",) RFQ NO. 12-04-02 i ,: <br /> 1 TRAFFIC & TRANSPORTATION ENGINEERING 's•'' <br /> CSA c;o;P;; <br /> O.1Q44.14 4.144 <br /> Idevelopment as well as managing traffic circulation and important aspects of the design such as the engineering <br /> access. integrity. <br /> 8. Sustainability An independent team will conduct Quality Control reviews <br /> We are an advocate of sustainability and try to incorporate during the different phases of the assigned tasks. The <br /> this approach in our projects. As active member of the reviews will be conducted to evaluate procedures, staffing, <br /> United States Green Building Council (USGBC) our job is to criteria used, and documentation. Special emphasis will be <br /> Ilook at sustainable approaches to the projects we are placed to ensure proper coordination and transfer of <br /> involved with. Recently the US conference of Mayors information is obtained. <br /> I <br /> announced they would be implementing Sustainable <br /> Initiatives within US Cities. We would like to be part of the The CSA Group Team's QC Program keeps track of every <br /> team that makes a difference in making the City a better step of the design process utilizing standard color coding <br /> place to live, work, commute and play. Our approach is (red for mark-up, green for checking, black for informational <br /> Iguided by the nationally accepted benchmark for the purposes only and yellow for work complete on CADD). The <br /> design, construction, and operation of projects. QA Process will document the completion of each QC <br /> review to ensure that all QC processes have been <br /> I 8. Quality Assurance & Quality Control completed. The QA Plan has extensive provisions to check <br /> The management of the CSA Group is dedicated to quality all of the subconsultants designs to assure that they are <br /> production and has inspired all employees to follow this following their own QA/QC Plan. CSA Group has consistently <br /> ' principle while performing their daily work activities. received high grades on many projects as a result of the <br /> Management strongly believes that quality is conformance consistent implementation of this program. <br /> to established requirements and meeting the expectations <br /> I of our clients. Quality assurance procedures are directed <br /> towards all technical activities, but it is recognized that <br /> quality is an individual responsibility and is applicable to all <br /> I staff members. The principles of quality assurance vary <br /> little from one technical discipline to another. These <br /> include clarity of scope, thoroughness of work planning, <br /> I adherence to schedule, structuring of project teams, <br /> communication, formal checking, maintenance of records, <br /> and other related activities. As projects become larger and <br /> I more complex, more people become involved. Project <br /> management, communication and teamwork assume greater <br /> importance and lead to more specific structuring of the <br /> I project team. We believe in a continuing quality <br /> improvement program that is directed towards error <br /> prevention rather than error correction. <br /> As the City Consultant, the above referenced concept will <br /> be expected from the designers performing the assigned <br /> I <br /> tasks. The CSA Group's Quality Control Manager will <br /> conduct periodic reviews of the consultants performing the <br /> assigned tasks to ensure that the personnel performing <br /> tasks are in compliance with the requirements of their own <br /> DQuality Control Program. If these steps are followed as the <br /> projects are being performed, it will minimize errors, <br /> I permitting comments and revisions. This will allow the <br /> Consultant the opportunity to concentrate on more <br /> im <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.