Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Randy P. Hollingworth <br /> • Director of Planning and Landscape Design Studio, Senior Associate <br /> • <br /> • Professional Design Experience <br /> • ff J ? Randy Hollingworth has more than 30 years experience as an urban and landscape designer. His <br /> x' specialty is the design and development of mixed use projects and their integration within the <br /> • itt4 urban fabric. With a comprehensive understanding of the needs and requirements of various land <br /> • uses. Mr. Hollingworth has prepared development plans for a wide range of project types. He has <br /> • ((/ developed master plans and design guidelines for commercial and retail areas, office parks and <br /> residential communities in numerous urban locations throughout Florida.In addition to his extensive <br /> • . i urban design and planning experience.Mr.Hollingworth has worked on a wide variety of landscape <br /> • r = design,public open space and streetscape oriented projects in the Southeast Florida area. <br /> • <br /> • ` PROJECT EXPERIENCE <br /> • James Archer Smith Park, Homestead. Florida - Project Manager responsible for the landscape <br /> • design of this underutilized neighborhood pork. Since the existing facilities were underutilized and <br /> in deteriorated condition, the park was completely redesigned with all new facilities.The new plan <br /> • EDUCATION features multiple areas for recreation, both passive and active and a new feature in the park. a <br /> Master of Landscape <br /> • Architecture in Urban Design, handicap accessible interactive water feature. Other amenities included additional on street <br /> • Harvard University, 1984 parking, two dog parks, two playgrounds and multiple picnic areas. <br /> • Bachelor of Landscape Palm Aire Park, Pompano Beach, Florida - Project Manager. Responsible for the conceptual and <br /> • Architecture, University of detail design for a new neighborhood park on the site of a former tennis center.The program was <br /> • Guelph, 1978 developed utilizing public workshops and numerous meetings with local neighborhood groups. <br /> • Recreational facilities and activities within the five acre park will include; tennis, basketball, sand <br /> ® volleyball, bocce ball,racquetball.two playgrounds,on exercise fitness area,public restrooms and <br /> passive open space.Located adjacent to a large retention area and golf course,the site offers one <br /> • of the few public open spaces within the community for active and passive outdoor recreation. <br /> • <br /> • Wittkop Park Master Plan, Homestead, Florida- Project Manager responsible for the development of <br /> a master plan covering the redevelopment of this 2.5 acre pork located in the City of Homestead, <br /> • Florida. The park includes two basketball courts,a tot lot and large playground area,a dog park.two <br /> • handball courts,two tennis courts,a sand volleyball court and restroom facilities. The pork also includes <br /> • an administration office for park employees,a snack bar and maintenance shed for storage. <br /> • Beach Plaza Redevelopment and Public Beach Revitalization Design,Pompano Beach,Florida- Project <br /> • Manager responsible for the landscape architectural design master plan associated with this project <br /> • consisting of the redevelopment plan for the only beachfront area of the City.The project scope <br /> • includes the planning and layout of public amenities and beachfront activities and streetscape and <br /> public open space design along Pompano Beach Boulevard.The"New"Pompano Beach Boulevard <br /> • and extension to Atlantic Boulevard will create dramatic gateways to the City's beach area.The City <br /> to hos subsequently retained B&A to further develop the landscape plans and construction drawings <br /> • for the streetscape design of Atlantic Boulevard between Pompano Beach Boulevard and A1A. <br /> • The project entails a heavy public participation aspect regarding design concepts and input from <br /> residents of the area with several community workshops held to this effect. <br /> • <br /> East Atlantic Boulevard Streetscape-Project Manager responsible for the conceptual planning and <br /> • detail design for a one block redevelopment of the streetscape on Atlantic Boulevard.Serving as <br /> the gateway to Pompano Beach.this most eastern block of the Boulevard was designed to provide <br /> • a more pedestrian friendly environment and encourage outdoor cafes and sidewalk retail activities. <br /> • On street porting along both the north and south sides of the block were incorporated into the plan <br /> • to assist in calming the vehicular traffic while providing easy access to the Beach.The design was <br /> closely coordinated with the redevelopment of Pompano Beach Boulevard to provide a continuous <br /> • theme and character to the redevelopment of the Beach area. <br /> • <br /> • <br /> • Cba > www.bermelloajamil.com <br /> • <br /> • 33 <br />