Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Kirk J. Olney, RA <br /> • Landscape Architect <br /> • <br /> • /_ , - Professional Design Experience <br /> - Mr. Olney is a Registered Florida Landscape Architect with extensive experience in managing <br /> • landscape architectural and multi-disciplinary design, production and construction projects. <br /> • - • <br /> ^� - Most of his career has been focused on the public realm providing his experience on the design <br /> • ;1; and implementation of parks. streetscapes and roadway landscape design. Areas of practice <br /> ® y,�l'�,• include master planning, conceptual and detailed design, the production and management <br /> Fof construction documents, preparation of construction contract documents and construction <br /> • ,ti:f services. Management experience includes scope of services preparation and negotiation, office <br /> ® management, scheduling and managing staff time, tracking utilization and project organization. <br /> • Mr. Olney also has experience preparing and submitting applications to regulatory agencies and <br /> ® responding to comments accordingly to obtain required permits. His special area of interest and <br /> expertise is the use of tropical and subtropical plant material. <br /> • <br /> PROJECT EXPERIENCE <br /> ® EDUCATION Lauderdale Lakes Sheehcape Master Plan, Lauderdale Lakes, Florida' - Responsibilities included <br /> Bachelor of Science in Land- management of junior landscape architects and over saw design synthesis for streetscape master <br /> scope Architecture,• <br /> The Ohio State University, plan including landscape and hardscape treatment within the right-of-way as well as gateway <br /> ® Columbus.Ohio 1995 feature design. <br /> © West Palm Beach Gateway & Beautification, West Palm Beach. Florida' - Responsibilities included <br /> ® REGISTRATION project manager reporting to City staff; overseeing data collection and base mapping by junior <br /> FL License No.LA0001705 <br /> o landscape architect:gateway design synthesis:landscape master plan for fifteen miles of roadway; <br /> public presentations;and presentations to the City Commission. <br /> O Tamarac Downtown Sheehcape,Tamarac,Florida'-Activities included over seeing junior landscape <br /> O architects to take a conceptual master plan, completed by others. and developing construction <br /> ® drawings for new main street streetscape including drainage improvements, new roadway and <br /> • curbing.specialty roadway and pedestrian paving,site furniture,landscape and irrigation. <br /> ® Brampton Cove Park,Wellington,Florida'-Supervised junior landscape architect on design synthesis, <br /> • preparation of construction drawings,opinion of probably cost,technical specifications and bidding <br /> documents as well as supervised construction observation for one-acre passive park in cypress dome <br /> ® <br /> including entry feature trellis and sign,walking path,play equipment and dock/pier. <br /> • <br /> • Hillsboro Inlet Park, Pompano Beach, Florida' - Activities included site planning; tree relocation <br /> • plan;preparation of hardscape and landscape construction drawings,and coordination with other <br /> design disciplines for a passive park along the Intracoastal waterway with walking path,parking lot, <br /> • tot lot/playground.boardwalk/pier and restroom facility. <br /> • <br /> • Broward County Greenways Corridor Design, Broward County. Florida' - Prepared construction <br /> drawings from conceptual signage design; prepared bench, bike rack, bus shelter and trash <br /> • <br /> receptacle layout plans; prepared landscape construction drawings for fifty mile multi-purpose <br /> • greenway path. <br /> • <br /> Sunrise Roller Hockey Facility,Sunrise, Florida' • Synthesized design concept, prepared hardscape <br /> • construction drawing including speciality paving. prepared landscape construction drawings, <br /> • coordinated design with lead engineer, worked with dasher board soles representative on <br /> ® appropriated specifications and costing.provided construction observation services for a five acre, <br /> • three court roller hockey facility with elevated bleacher stands and restroom/concession building. <br /> • Tamarac Sports Complex, Tamarac, Florida' - Responsible for site plan, City Planning department <br /> • approval and presentation to City commission; prepared hardscape, amenities and landscape <br /> • construction drawings;performed construction coordination and observation services for expansion <br /> • Cba D. www.bermelloajamil.com <br /> • <br /> • 36 <br />