Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> O <br /> • <br /> • <br /> ® Kirk J. Olney, RLA <br /> • Landscape Architect <br /> • <br /> • Dade Boulevard Bike Path, Miami Beach, Florida' - Responsible for coordination of civil sub <br /> consultant on seawall and seawall cap design. mangrove mitigation application. tree removal <br /> • license application and pathway design for installation of an 8' wide bike path between County <br /> • right-of-way and a major ACOE brackish canal. <br /> SW 14th Avenue Sheetscape Improvements, Delray Beach, Florida' - Responsible for coordination <br /> with civil engineering prime consultant, coordination meetings with owner and landscape design <br /> • for reconstruction of ' mile of roadway including on street parking. drainage improvements and <br /> • landscape. <br /> • Catherine Strong Park,Delray Beach,Florida'- Responsible for client review meetings.plant selection <br /> and specification: hardscape design, preparation of hardscape details, coordination with other <br /> • design disciplines,preparation of opinion of probably cost and modifying design to keep proposed <br /> • improvements within budget and preparation of bidding documents for a ten acre passive and <br /> ® active recreation park with walking path, picnic pavilions, seating, interactive water play, tot lot/ <br /> playground,restroom building,parking and landscape. <br /> • <br /> • Halpatiokee Regional Park,Martin County,Florida'-Responsible for field verification of existing trees: <br /> • coordination of civil sub-consultant:preparation of tree relocation plans;preparation of hardscape <br /> construction drawings including fencing and paving details:preparation of landscape construction <br /> • drawings; provided construction observation services including supervision of tree relocation for a <br /> ® 200 acre active and passive recreation pork with five softball fields,five soccer fields,ten tennis courts, <br /> • cover roller hockey rink, preserved wetland areas. .5 mile nature trail, three restroom/concession <br /> • buildings and parking. <br /> • Indian Riverside Park,Jensen Beach,Florida'-Responsible for bidding assistance;managed civil and <br /> • architecture sub-consultants:performed construction administration services including organization <br /> O and documenting of bi-weekly meetings for a 30 acre passive park on Indian River Lagoon with 10,000 <br /> • square foot community center, 1000' fishing pier, pedestrian pathway,landscape and parking. <br /> • West Avenue/Bay Road, Miami Beach, Florida' - Prepared landscape construction drawings: <br /> O prepared bidding documents:assisted City staff during construction for drainage improvements to <br /> ® residential neighborhood including underground pumping station, new right-of-way cross section, <br /> reconstruction of 2000 feet of roadway and new landscape;activities included managing civil sub- <br /> consultant. <br /> 0 <br /> NW 6th Avenue, Pompano Beach, Florida' - Developed conceptual design. created by others. <br /> into construction drawings and coordinated with structural and civil engineer as well as inigation <br /> O designer:prepared hardscape and landscape construction drawings for streetscape improvements <br /> 0 including new cross section, speciality pedestrian and vehicular paving, bus shelters, gateway <br /> U column features and landscape. <br /> 0 Flamingo Park 2005 Emergency Hurricane Forestry Grant Application, West Palm Beach, Florida' - <br /> • Prepared grant application to reforest neighborhood after Hurricane Francis and Hurricane Jean; <br /> • activities include preparing grant application,field verification:base plan development;preparation <br /> O of landscape construction drawings:monitored and reported on health of installed plants. <br /> Charnow Park,Hollywood, Florida' - Performed construction management responsibilities including <br /> weekly meetings with contractor and client,resolving conflicts between construction drawings and <br /> O filed conditions,nursery visits to tag plant material,field reports,preparation of sketches and drawings <br /> as needed and coordination of other design discipline.The three acre park included pavilions, tot <br /> O lots and play grounds,tier seating with trellis and interactive water feature. <br /> O <br /> • <br /> • <br /> Cba > www.bermelloajamil.com <br /> 38 <br />