|
•
<br /> •
<br /> •
<br /> •
<br /> O
<br /> •
<br /> •
<br /> ® Kirk J. Olney, RLA
<br /> • Landscape Architect
<br /> •
<br /> • Dade Boulevard Bike Path, Miami Beach, Florida' - Responsible for coordination of civil sub
<br /> consultant on seawall and seawall cap design. mangrove mitigation application. tree removal
<br /> • license application and pathway design for installation of an 8' wide bike path between County
<br /> • right-of-way and a major ACOE brackish canal.
<br /> SW 14th Avenue Sheetscape Improvements, Delray Beach, Florida' - Responsible for coordination
<br /> with civil engineering prime consultant, coordination meetings with owner and landscape design
<br /> • for reconstruction of ' mile of roadway including on street parking. drainage improvements and
<br /> • landscape.
<br /> • Catherine Strong Park,Delray Beach,Florida'- Responsible for client review meetings.plant selection
<br /> and specification: hardscape design, preparation of hardscape details, coordination with other
<br /> • design disciplines,preparation of opinion of probably cost and modifying design to keep proposed
<br /> • improvements within budget and preparation of bidding documents for a ten acre passive and
<br /> ® active recreation park with walking path, picnic pavilions, seating, interactive water play, tot lot/
<br /> playground,restroom building,parking and landscape.
<br /> •
<br /> • Halpatiokee Regional Park,Martin County,Florida'-Responsible for field verification of existing trees:
<br /> • coordination of civil sub-consultant:preparation of tree relocation plans;preparation of hardscape
<br /> construction drawings including fencing and paving details:preparation of landscape construction
<br /> • drawings; provided construction observation services including supervision of tree relocation for a
<br /> ® 200 acre active and passive recreation pork with five softball fields,five soccer fields,ten tennis courts,
<br /> • cover roller hockey rink, preserved wetland areas. .5 mile nature trail, three restroom/concession
<br /> • buildings and parking.
<br /> • Indian Riverside Park,Jensen Beach,Florida'-Responsible for bidding assistance;managed civil and
<br /> • architecture sub-consultants:performed construction administration services including organization
<br /> O and documenting of bi-weekly meetings for a 30 acre passive park on Indian River Lagoon with 10,000
<br /> • square foot community center, 1000' fishing pier, pedestrian pathway,landscape and parking.
<br /> • West Avenue/Bay Road, Miami Beach, Florida' - Prepared landscape construction drawings:
<br /> O prepared bidding documents:assisted City staff during construction for drainage improvements to
<br /> ® residential neighborhood including underground pumping station, new right-of-way cross section,
<br /> reconstruction of 2000 feet of roadway and new landscape;activities included managing civil sub-
<br /> consultant.
<br /> 0
<br /> NW 6th Avenue, Pompano Beach, Florida' - Developed conceptual design. created by others.
<br /> into construction drawings and coordinated with structural and civil engineer as well as inigation
<br /> O designer:prepared hardscape and landscape construction drawings for streetscape improvements
<br /> 0 including new cross section, speciality pedestrian and vehicular paving, bus shelters, gateway
<br /> U column features and landscape.
<br /> 0 Flamingo Park 2005 Emergency Hurricane Forestry Grant Application, West Palm Beach, Florida' -
<br /> • Prepared grant application to reforest neighborhood after Hurricane Francis and Hurricane Jean;
<br /> • activities include preparing grant application,field verification:base plan development;preparation
<br /> O of landscape construction drawings:monitored and reported on health of installed plants.
<br /> Charnow Park,Hollywood, Florida' - Performed construction management responsibilities including
<br /> weekly meetings with contractor and client,resolving conflicts between construction drawings and
<br /> O filed conditions,nursery visits to tag plant material,field reports,preparation of sketches and drawings
<br /> as needed and coordination of other design discipline.The three acre park included pavilions, tot
<br /> O lots and play grounds,tier seating with trellis and interactive water feature.
<br /> O
<br /> •
<br /> •
<br /> Cba > www.bermelloajamil.com
<br /> 38
<br />
|