My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil - Urban Planning
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Bermello Ajamil
>
Bermello Ajamil - Urban Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 3:30:26 PM
Creation date
2/3/2016 3:30:25 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> REFERENCES <br /> • <br /> • <br /> • <br /> • <br /> O <br /> • C RAPOMPANO BEACH <br /> • P.O.Drawer 1300 Phone:(954)786-5535 <br /> • <br /> Pompano Beach,FL 33061 Fax:(954)786-7836 <br /> O <br /> • April 21,2010 <br /> O <br /> • <br /> Miami Community Redevelopment Agency(CRA) <br /> • 49 NW 5 Stat,Suite 100 <br /> Miami,FL 33123 <br /> 0 <br /> ! RE Bernell*Ajamil A Partners,Inc.-Letter of Recommendation <br /> • <br /> • To Whom h May Cancan: <br /> ! 1 am happy to recommend Betmello Ajamil It Partners.Inc.("BA")and 1 take this opportunity to provide <br /> • you saute additional information,which may be useful during yam review of the firm. <br /> • The firm strives to keep us lnferated of any progress and stats of eaeb assigned project BA personnel is <br /> • courteous and responds to requests in a timely n maa using a variety of methods Sterling. but not <br /> • limited to,telephone calls(regular and cells),e-mails,mail,and in peso(meetings or periodic visits). <br /> • The firm is very familiar with ow Agency's needs and/or assigned project(s)and has demonstrated a <br /> • comprehensive knowledge of our present infastrtxture. This is the result of working together and <br /> combining forcers every step of the way.The firm has assisted the CRA in implementing specific services <br /> • ®ed a meeting State and County res ms <br /> • It is oma <br /> belief the firm is widely knowledgable of governmental funding avenues,i.e.Mt/MD,FEMA <br /> etc.,and a the pumas time,the firm is assisting the CRA to obtain a series of permits and Ikeaset for a <br /> • sizable venture. <br /> • The firm is presently oda contract to provide professional services(Lem civil mgt.aohitectmtl <br /> • landscaping lid, site pfaaming, to name a few) as a prime or sub-consultant for the following <br /> • pro— <br /> • • Eau Atlantic Boulevard (prime, 51,000,000.00) – RoadwayfStrorts. pe Design including <br /> • wig sidewalks,additional drainage,narrow existing roadways,widening landscape medians. <br /> • • Harbor Village (prime, 51,000,000.00)– Civil and Architectural Landscape Design including <br /> widening sidewalks, ag $real&image, retm58matioo of an existing public parting facility, <br /> • landscape pans <br /> • • Pompano Beach Boulevard(sub-consulters,$).000,000.00)–Civil and Architectural Landscape <br /> includingwid g sidewalks,.re onfgmaion of en existing public roadway.beach pian <br /> • and on-greet <br /> • • Collier City(prime,5110,000.00)–Maiming savior for a Neighborhood Plan to ids needs, <br /> • Rending seems,etc. <br /> •• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • CFA CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CC NA) <br /> RFQ No. 12-04-02 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.