Laserfiche WebLink
I cis <br /> 1 'CONSULTANTS,INC. Todd Pace <br /> Drafter <br /> Professional Experience: 24 yrs Professional Qualification <br /> 1 Years with Firm: <I <br /> Mr. Pace is an accomplished Civil Designer with over 20 years of <br /> Education experience and a strong background in design, layout, and the <br /> Florida Community College of quantifying of materials on various construction and water & sewer <br /> I Jacksonville, 1988 design projects. Throughout his career, he has worked closely with <br /> engineers to develop civil engineering plans for various clients, <br /> Areas of Expertise including private developers, local municipalities, and government <br /> 1 ✓ CAD Design agencies. Specific tasks have included completing site designs for <br /> I Roadways commercial and residential properties, roadways, and infrastructure; <br /> I Infrastructure overseeing the construction of jobs as necessary; traveling to sites for <br /> I Housing Design inspections; and conducting quality assurance on computer aided <br /> 1 ✓ As-built Drawings drafting (CAD) drawings. <br /> I Water&Wastewater <br /> Facilities Project Experience <br /> ✓ Storm water& Drainage <br /> Certifications Water Main and Force Main Extension at Biscayne Blvd., Jacksonville, <br /> • AutoCad Florida-CAD Designer <br /> • AutoDesk Mr. Pace was responsible for the design of a 1.5-mile water main and <br /> • Civil3D force main extension project. The scope of work included the <br /> • AufoTurn preparation of plan drawings, profile drawings, and details, as well as <br /> • MicroStation quantifying of materials required for construction and the preparation <br /> "• Hydroflow of documents for as-built conditions. <br /> JEA Trenton and Detaille Water & Sewer Rehabiliation Groundworks <br /> _ -c-• Project, Jacksonville, Florida-CAD Designer <br /> I j ;rte ` t_ Mr. Pace designed for a JEA water and sewer rehabilitation project' y, K s with a scope of work that included the preparation of plan drawings, <br /> > •� 4 ,`It ti,{t•---,-''• profile drawings, and details, as well as quantifying of materials <br /> 4:cam ax.r • `ti '- required for construction and the preparation of documents for as- <br /> 1built conditions. <br /> Russell Sampson Road Widening, Jacksonville, Florida-CAD Designer <br /> Mr. Pace was responsible for the design of a 1.4-mile road widening <br /> 1 project. The scope of work included preparation of site geometry and <br /> utility and site grading plans for each phase of construction. He <br /> prepared cross-sections and pond sections of proposed work along <br /> I with plan and profile drawings and maintenance of traffic for each <br /> phase of construction. <br /> Kernan Boulevard Design Project, Jacksonville, Florida-CAD Designer <br /> I Mr. Pace was responsible for generating as-built drawings for the <br /> Kernan Blvd. roadway project, reviewing survey plans, and adjusting <br /> design plans to reflect any deviations in the project design. <br /> I Miscellaneous Projects, Jacksonville, Florida-Senior Designer <br /> Mr. Pace is responsible for the design of small- to medium-sized routine <br /> projects, planning and producing completed design phases and tasks <br /> I within the scope of larger and more diverse design assignments. He is <br /> proficient in the operation of technical principals, including advanced <br /> knowledge of engineering, design, planning, and the interpretation of <br /> surveys, and works closely with engineers to develop and plan projects <br /> Ito meet the needs of the client within the specified time periods. His <br /> www.cesconsult.com <br /> I <br /> ICity of Sunny Isles Beach Continuing Professional Architectural&Engineering Services RFQ 12-04-02 I 20 <br />