My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants - Environmental
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
CES Consultants - Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 3:32:05 PM
Creation date
2/3/2016 3:32:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> MILLER " LEGG Dylan Larson, PWS, CEP <br /> IEnvironmental Engineering <br /> Professional Experience: 19 yrs Professional Qualification <br /> 1 Education Mr. Larson has significant experience in environmental consulting in <br /> M.S.,Coastal Zone Florida and is responsible for overseeing and performing studies and <br /> Management. Marine Biology investigations on biological and ecological impacts affecting the <br /> I <br /> Nova Southeastern University, firm's projects. This includes field evaluations, assessments, <br /> 20000recommendations and report writing. Dylan has established himself as <br /> a valuable leader and team member on a variety of the firm's projects <br /> I B.S., Environmental Studies, that have involved environmental issues. Specific responsibilities <br /> State University of New York, wetland jurisdictional determination, dredge and fill <br /> 1996 permitting, wetland mitigation design, mitigation monitoring, <br /> recommendations for maintenance procedures, coordination and <br /> I Areas of Expertiseoversight of environmental GIS applications, and assistance with plan <br /> I Environmental Engineering preparations and mitigation. <br /> I Wetlands Restoration <br /> I Biological Monitoring Project Experience <br /> 1 ✓ Corridor Studies <br /> I Transportation West Lake Park Phase I -Engineering Services <br /> ✓ Water& Force Mains Phase one of this 1,500-acre award winning environmental park and <br /> I Roadways & Highways nature center in Hollywood. Services provided included: paving and <br /> 1 I Infrastructure & Utilities - drainage improvements for the nature center and associated parking <br /> ✓. Permitting lot, design of three sewage pump stations, water distribution system <br /> ;Certifications : - design, sanitary sewage collection and transmission system design, <br /> 1 Professional Wetland oft-site force main, traffic enginee ng, surveying, environmental <br /> ar`* Scienbst"1999 mitigation and design, and restoration of mangrove preservation <br /> �. liM �"" areas. Award: En ineerin Excellence Award, American Council of <br /> Wetland JT9?--'*::0,;::.6:teotlon g g <br /> Certfication 1995= „ Engrneenng Companies, 2004 <br /> 1 6- Certified Environmental <br /> Professional, 2004-„ South Florida Water Management District Miscellaneous Environmental <br /> a GM Certified` ' Rescue Engineering Support Services to Comprehensive Everglades <br /> I Diver,gin Restoration Project(CERP) Contract- Environmental Engineer <br /> Through a three-year contract, Miller Legg provided miscellaneous <br /> environmental consulting support services to the South Florida Water <br /> Management District for the CERP project including wildlife surveys <br /> I and identification, wetlands evaluations, geographic information <br /> systems (GIS)/remote sensing, National Environmental Policy Act <br /> (NEPA) compliance assistance, wetland jurisdictional analysis, <br /> environmental permitting and threatened and endangered species <br /> 1 services. Additional services included: civil engineering, structural <br /> engineering, water resources engineering, mechanical, geotechnical <br /> and environmental engineering, architectural, land surveying, <br /> I <br /> electrical engineering, landscape architecture, emergency <br /> management and engineering economic studies. <br /> Hallandale Beach Water and Force Main-Biological Monitoring <br /> I Miller Legg was on call to provide biological monitoring services for <br /> horizontal directional drill crossing under the Intracoastal Waterway at <br /> three bridge locations within the City. While drilling is occurring, we <br /> were on standby in the event there is a fracture in the sediment <br /> 1 (frac-out). In that case,we responded within two hours. <br /> Iwww.cesconsult.com <br /> I <br /> 1 City of Sunny Isles Beach Continuing Professional Architectural&Engineering Services RFQ 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.