Laserfiche WebLink
I <br /> 10 expansion of the Hialeah Preston Wafer Treatment Plant. CES also recently completed the <br /> design of over 3 miles of 12-inch pipeline design under a separate contract under the <br /> Needs Assessment Program. <br /> 11 CES also provided Construction Inspections Services to the City of Fort Lauderdale as part <br /> of the City's Waterworks 2011 Infrastructure Improvement project. The project involved the <br /> O installation of new storm water drainage, new water and sewer pipeline construction and <br /> pumping stations; and overseeing the reconstruction of roadways and sidewalks. <br /> 11 CES has a highly experienced staff with extensive knowledge in all areas of Engineering <br /> and Construction Management including; Civil Engineering; Structural Engineering; <br /> Environmental Engineering; Estimating, Scheduling, and Inspection Services. We can assure <br /> 1 our client the very best because of our skilled and qualified team. <br /> Client: Miami Dade County Public Works Dept-CES Project <br /> I Contact Info. Miami Dade County Public Works Department 111 NW 1st <br /> Street Miami, FL 33128 305-755-7856 <br /> Category: Civil Engineering I Construction Testing&Inspections ° •; 'f i 4 <br /> IProject Name Master Consulting Contract/for major Infrastructures 4:15::-4.:;:k7-7.:::: ':-.jt::‘ ::: <br /> /Description: Improvements such as Drainage, Sidewalks,ADA Ramps, Curb '` <br /> and Gutter, MOT,Roadway Reconstruction, Landscaping. <br /> I Contract Value: $4,000,000 �4. <br /> Contract Duration: 5 years SiI'Y" <br /> Client Contact: Octavio Marin,P.E./Ph: 305.375.2116 -="^' S <br /> I Prime or Sub: Prime ".=" �E <br /> Results: Improved security,safety,accessibility <br /> Client: Broward County Aviation Department-CES Project <br /> I ()Contact Info. 320 Terminal Dr _ <br /> Fort Lauderdale,FL 33315 . t� e�� !. <br /> Category: Utilities Engineering .mss S <br /> Project Name Ft. Lauderdale Airport Utility Atlas Update/ / ) 7f7 �� . <br /> I <br /> (Description: Provided an accurate Existing Utility Atlas for all of Ft. �.r ,� <br /> Lauderdale-Hollywood International Airport. -CCP. -- --1+ s >"'a <br /> Contract Value: $130,000 \'�' <br /> 1 }moi f �; '� <br /> Contract Duration: 2 years k :.. i..et- ' -,t- <br /> Client Contact: Michael Moore, P.E./Ph:(954)236-737 •7 _ %t., , w¢ei ..-�� " <br /> Prime or Sub: Sub _ , <br /> I <br /> Results: Development ensures there is coordination between the various ,,� c <br /> information sources to create a final updated Utility Base Map. <br /> I Client: City Opa-Locka-CES Project _ <br /> Contact Info. 780 fisherman Street,4TH FLOOR•Opa-Locka, FL 33054• t <br /> (305)953-2868 .� <br /> Category: Construction Inspection <br /> I _ _,,,.F <br /> Project Name Canal Improvements /Provided construction engineering and ftter 4_.' <br /> /Description:: inspection services to the Cityof Opa-Locka as part of the Ci s �` "_'J. t rJr- <br /> stormwatermitigationprogram. ,,1.-...4. ^L•4` ••., <br /> I iT_ <br /> Contract Value: 3 years10,000,000 * atm--1 a lea <br /> Contract Duration: 3 years �' <br /> Client Contact: Christoper A.Niforatos,P.E./Ph:813.876.6800 <br /> Prime or Sub: Sub to Atkins <br /> 1 .. �_ ..- <br /> Results: Mitigate flooding problems <br /> 1 City of Sunny Isles Beach Continuing Professional Architectural& Engineering Services REa 12-04-02 I 8 <br />