My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Keith Schnars - Urban Planing
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Keith Schnars
>
Keith Schnars - Urban Planing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 4:27:05 PM
Creation date
2/3/2016 4:27:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ® Jose Jorge Fema1w/ez MPM <br /> ® Deputy Frac/Manager <br /> 0 <br /> ® #" <br /> ® r <br /> ® Mr. Fernandez is a certified Master Project Manager(MPM)with over 25 years of exten- <br /> t sive project management experience managing architectural and vertical construction <br /> ® facility projects with direct responsibility and accountability for day-to-day operations <br /> ® and performance of the project team and support staff.As project manager and principal <br /> `� point of contact(POC)for clients and agencies, Mr. Fernandez has been responsible for <br /> ® Lis. 0? - assessing and verifying contractual compliance on design-build,design-bid-build,capital <br /> ® `` -...,-Xt. - : improvement and renovation projects. <br /> e experience <br /> ® Ransom Everglades Aquatic Center, Coconut Grove, FL. Providing project manage- <br /> • ment for design of a S7 million Aquatic Center Complex that contained bleachers for <br /> • 1,000 spectators, lockers,offices and other support spaces. BEA provided complete NE <br /> /egisnd/ion services for this aquatic center in a sensitive and historical environment.The building has <br /> ® Master Project Manager(MPM) an above ground competition-sized pool,training pool,arena,gymnasium,offices,ancillary <br /> O Certification facilities and parking areas. The surrounding landscape design includes a seating plaza <br /> dedicated to the students and two new tennis courts.A beautified walkway links the new <br /> O FEMA Incident Command System sports facilities to the existing gymnasium and football field to unify the school's sports <br /> ® Certification ICS 100.ICS 200, complex. BEA conducted a program and budget verification, zoning and code analysis <br /> ICS 700,ICS 800,IS 1oo.Hc and design concept for the new facility. <br /> ® Candidate-LEER AP University of Miami Life Science and Technology Park,Miami, FL. Served as Senior <br /> Project Manager for the$60 million University of Miami Life Science and Technology Park, <br /> • Phase I consisting of 250,000-SF Type B occupancy space designed as an incubator <br /> ® facility for research and development start-ups. <br /> educate <br /> ® university of Miami Cruise Terminal 6,Port Canaveral,FL.Providing project management for the design-build <br /> School of Architecture of a state-of-the-art, 105,000-SF passenger cruise terminal. The two-story facility was <br /> ® designed to meet the comfort needs of passengers, and conforms to the technical and <br /> ® Miami-Dade Community college operational requirements of mega cruise ships—the largest cruise ships in the industry <br /> that hold 5,000 passengers.Special attention was given to passenger needs in an effort to <br /> • enhance the overall cruise experience.Passenger drop-off areas will have wide canopies <br /> ® to provide shelter from the sun and rain.The tall curtain wall in the lobby area will provide <br /> prolessinn• <br /> ® Fellow,American— passengers with views of cruise ships, as well as bring natural light into the space. <br /> ® eia8en , City of Ft. Lauderdale/Hurricanes Katrina and Wilma Design, Engineering,Archi- <br /> canAcademy of tectural, and Project Management Remediation Projects, Fort Lauderdale, FL <br /> ® Project Management Sr. Project Manager responsible for overseeing this Task Order contract with the City <br /> of Fort Lauderdale, Florida. The Scope of Services included assessment of hurricane <br /> ® Army Engineer Assodation damages to numerous public facilities, providing professional NE design services and <br /> ® staff to design and engineer, prepare cost estimates, prepare bid documents and review <br /> ® bids tendered,oversee and manage the construction phase for work necessary to repair <br /> damages caused by Hurricanes Katrina and Wilma to numerous City of Fort Lauderdale <br /> ® public service facilities. The aggregate construction costs for all hurricane remediation <br /> ® and reconstruction projects that I managed through this Task Order were in the magnitude <br /> of$50M range. <br /> • <br /> efCity of Ft. Lauderdale Architectural Services Continuing Contract,Ft. Lauderdale, FL <br /> Sr. Project Manger responsible for overseeing this Task Order contract with the City of <br /> • ® ! 1 Fort Lauderdale. The Scope of Services required providing as-needed NE and project <br /> ®® management services for various capital improvement projects.The aggregate construc- <br /> tion costs for all projects that I managed through this Task Order were in the magnitude <br /> • a of$20M range. <br /> O architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.