|
war+ � ,,
<br /> C { �;ez" F ° A ��LAR, 1M
<br /> rt' f ,' M 4 . MrVilar has over 14 years of extensive professional experience in the design of water/wastewater
<br /> > F h fz #; systems, design of drainage and storm water management systems, site design and development, w.
<br /> % ` $t-'a-, preparation of contract documents and specifications for bid and permitting services experience
<br /> .:,;,4) through numerous South Florida agencies. His experience includes design of water and wastewater
<br /> ,..c t„"' ' improvements for the City of Fort Lauderdale, rehabilitation of lift stations in City of Coconut
<br /> 3' a, ' �, f: Creek and North Lauderdale,and neighborhood improvements for the Westgate CRA.Professional
<br /> 1. 2 t ' :'tis experience also includes work on various land development projects for Seminole Tribe of Florida,
<br /> ' '` Coscan Homes and also administering the NPDES Program for the City of Miami.
<br /> ACADEMIC RELEVANT EXPERIENCE
<br /> BACKGROUND
<br /> M.S.,Environmental FIRST SEMINOLE INDIAN BAPTIST CHURCH ADDITIONAL PARKING, FORT
<br /> Engineering,Florida LAUDERDALE, FL: The project scope for the 25-acre site development included parking lot
<br /> International University, improvements/expansions,andwater mains for fireprotection.lnaddition,the stormwatermanagement
<br /> 1995 system was expanded and consisted of swales and exfiltration trench to provide pre-treatment,water
<br /> quality and flood control for the improved site prior to discharging through a control structure into
<br /> the existing FDOT Turnpike Canal adjacent to the site.Drainage Calculations were performed to meet ,J^,
<br /> B.S,Civil Engineering, SFWMD,CBWD criteria and also FDOT. An FDOT Critical Storm Duration Analysis was performed
<br /> Florida International on 32 storm events in order to obtain the Drainage Connection Permit from FDOT.Responsibilities 0
<br /> University, 1992 included design of the site plan,water mains for fire protection,paving,grading,and drainage,pavement
<br /> marking and signage,and permitting.
<br /> A.A.,Miami-Dade College,
<br /> I988 WESTGATE CRA NORTH INFRASTRUCTURE IMPROVEMENTS PHASES IV, V, AND VI,
<br /> WEST PALM BEACH, FL: The proposed improvements included design and permitting services 6
<br /> PROF ESS ZONAL for the construction of the last three phases of a six phase 140-acre site for the Westgate Community
<br /> REGISTRATIONS Redevelopment Agency and located in West Palm Beach.The improvements involved paving,grading
<br /> and drainage,water main and sanitary sewer improvements within this existing subdivision comprised
<br /> Registered Professional of mainly residential and commercial properties.Responsibilities included the design of water,sewer,
<br /> Engineer,FL#55459 drainage, roadway, and pavement marking and signage. Permitting, bidding and negotiating and cost
<br /> estimating services were also provided. Client/Contact:Westgate CRA/Elizee Michel, Phone: (561)
<br /> 233-3626.(9/08 to 4/10)
<br /> WATER AND WASTEWATER IMPROVEMENT PROJECT FOR LAUDERDALE WEST,
<br /> SUNSET NORTH, RIVER RUN, FLAMINGO PARK, OAK RIVER, SHADY BANKS AND 0
<br /> EDGEWOOD COMMUNITIES, BROWARD COUNTY, FL: Project Manager for the design of
<br /> water and wastewater improvements for the City of Fort Lauderdale Water Works 2011 Program.The 0
<br /> service areas for these projects are comprised of a mixture of single family, multi-family,commercial, .
<br /> office and industrial uses.The design phase includes over 188,000 linear feet of gravity sewer,20,300
<br /> linear feet of force mains, 16 new wastewater pump stations,and 43,000 linear feet of water mains.
<br /> The total construction value was estimated to be 30 million dollars. Client/Contact City of Fort
<br /> Lauderdale/Paul Bohlander,P.E.,Phone:(954) 522-2604.(1/03 to 6/09)
<br /> SEWER STUDY FOR CHULA VISTA/RIVER LANDS/LAUDERDALE ISLE AND RIVER
<br /> LANES COMMUNITIES, BROWARD COUNTY, FL: Project Manager for an engineering study
<br /> to provide sanitary sewer systems to several residential communities which are being serviced by
<br /> individual septic tank systems and recently annexed by the City of Fort Lauderdale.The study area
<br /> comprised of 425-acres of mostly single-family dwellings. The study identified and evaluated several 0
<br /> options to service the subject communities.The recommended wastewater system includes 55,000
<br /> linear feet of gravity sanitary sewer collection systems,7,000 linear feet of force mains and three (3)
<br /> wastewater pump stations. The total construction value was estimated to be $10 million. Client/
<br /> Contact:City of Fort Lauderdale/Paul Bohlander,P.E.,Phone:(954) 522-2604.(4/03 to 10/03)
<br /> ARDEN PARK, HOLLYWOOD, FL: Redevelopment of a former 33-acre mobile home park into
<br /> a 153 unit residential development in Hollywood.The design and permitting was done in three phases: 1
<br /> 1. demolition phase involved removal of the mobile homes and existing utilities within the site,and
<br /> capping the existing utilities at the right of way.2.Lake Improvements Phase involved the partial filling
<br /> of two existing lakes and sizing/ designing the two proposed lakes that would ultimately serve as the
<br /> sites storm water management system. 3. Residential Development phase was the master design
<br /> of the potable water, sanitary sewer, paving,grading and drainage, pavement marking & signage and
<br /> roadway design for the proposed 153 unit development.
<br /> -11_10:21-- KEITH and SCHNARS• ,P.A. ._ ..._.r. _ ���
<br /> ' -- FLORIDAS USS LOCAL FIRM
<br /> PACE 24 RFQ12-04-02
<br />
|