Laserfiche WebLink
war+ � ,, <br /> C { �;ez" F ° A ��LAR, 1M <br /> rt' f ,' M 4 . MrVilar has over 14 years of extensive professional experience in the design of water/wastewater <br /> > F h fz #; systems, design of drainage and storm water management systems, site design and development, w. <br /> % ` $t-'a-, preparation of contract documents and specifications for bid and permitting services experience <br /> .:,;,4) through numerous South Florida agencies. His experience includes design of water and wastewater <br /> ,..c t„"' ' improvements for the City of Fort Lauderdale, rehabilitation of lift stations in City of Coconut <br /> 3' a, ' �, f: Creek and North Lauderdale,and neighborhood improvements for the Westgate CRA.Professional <br /> 1. 2 t ' :'tis experience also includes work on various land development projects for Seminole Tribe of Florida, <br /> ' '` Coscan Homes and also administering the NPDES Program for the City of Miami. <br /> ACADEMIC RELEVANT EXPERIENCE <br /> BACKGROUND <br /> M.S.,Environmental FIRST SEMINOLE INDIAN BAPTIST CHURCH ADDITIONAL PARKING, FORT <br /> Engineering,Florida LAUDERDALE, FL: The project scope for the 25-acre site development included parking lot <br /> International University, improvements/expansions,andwater mains for fireprotection.lnaddition,the stormwatermanagement <br /> 1995 system was expanded and consisted of swales and exfiltration trench to provide pre-treatment,water <br /> quality and flood control for the improved site prior to discharging through a control structure into <br /> the existing FDOT Turnpike Canal adjacent to the site.Drainage Calculations were performed to meet ,J^, <br /> B.S,Civil Engineering, SFWMD,CBWD criteria and also FDOT. An FDOT Critical Storm Duration Analysis was performed <br /> Florida International on 32 storm events in order to obtain the Drainage Connection Permit from FDOT.Responsibilities 0 <br /> University, 1992 included design of the site plan,water mains for fire protection,paving,grading,and drainage,pavement <br /> marking and signage,and permitting. <br /> A.A.,Miami-Dade College, <br /> I988 WESTGATE CRA NORTH INFRASTRUCTURE IMPROVEMENTS PHASES IV, V, AND VI, <br /> WEST PALM BEACH, FL: The proposed improvements included design and permitting services 6 <br /> PROF ESS ZONAL for the construction of the last three phases of a six phase 140-acre site for the Westgate Community <br /> REGISTRATIONS Redevelopment Agency and located in West Palm Beach.The improvements involved paving,grading <br /> and drainage,water main and sanitary sewer improvements within this existing subdivision comprised <br /> Registered Professional of mainly residential and commercial properties.Responsibilities included the design of water,sewer, <br /> Engineer,FL#55459 drainage, roadway, and pavement marking and signage. Permitting, bidding and negotiating and cost <br /> estimating services were also provided. Client/Contact:Westgate CRA/Elizee Michel, Phone: (561) <br /> 233-3626.(9/08 to 4/10) <br /> WATER AND WASTEWATER IMPROVEMENT PROJECT FOR LAUDERDALE WEST, <br /> SUNSET NORTH, RIVER RUN, FLAMINGO PARK, OAK RIVER, SHADY BANKS AND 0 <br /> EDGEWOOD COMMUNITIES, BROWARD COUNTY, FL: Project Manager for the design of <br /> water and wastewater improvements for the City of Fort Lauderdale Water Works 2011 Program.The 0 <br /> service areas for these projects are comprised of a mixture of single family, multi-family,commercial, . <br /> office and industrial uses.The design phase includes over 188,000 linear feet of gravity sewer,20,300 <br /> linear feet of force mains, 16 new wastewater pump stations,and 43,000 linear feet of water mains. <br /> The total construction value was estimated to be 30 million dollars. Client/Contact City of Fort <br /> Lauderdale/Paul Bohlander,P.E.,Phone:(954) 522-2604.(1/03 to 6/09) <br /> SEWER STUDY FOR CHULA VISTA/RIVER LANDS/LAUDERDALE ISLE AND RIVER <br /> LANES COMMUNITIES, BROWARD COUNTY, FL: Project Manager for an engineering study <br /> to provide sanitary sewer systems to several residential communities which are being serviced by <br /> individual septic tank systems and recently annexed by the City of Fort Lauderdale.The study area <br /> comprised of 425-acres of mostly single-family dwellings. The study identified and evaluated several 0 <br /> options to service the subject communities.The recommended wastewater system includes 55,000 <br /> linear feet of gravity sanitary sewer collection systems,7,000 linear feet of force mains and three (3) <br /> wastewater pump stations. The total construction value was estimated to be $10 million. Client/ <br /> Contact:City of Fort Lauderdale/Paul Bohlander,P.E.,Phone:(954) 522-2604.(4/03 to 10/03) <br /> ARDEN PARK, HOLLYWOOD, FL: Redevelopment of a former 33-acre mobile home park into <br /> a 153 unit residential development in Hollywood.The design and permitting was done in three phases: 1 <br /> 1. demolition phase involved removal of the mobile homes and existing utilities within the site,and <br /> capping the existing utilities at the right of way.2.Lake Improvements Phase involved the partial filling <br /> of two existing lakes and sizing/ designing the two proposed lakes that would ultimately serve as the <br /> sites storm water management system. 3. Residential Development phase was the master design <br /> of the potable water, sanitary sewer, paving,grading and drainage, pavement marking & signage and <br /> roadway design for the proposed 153 unit development. <br /> -11_10:21-- KEITH and SCHNARS• ,P.A. ._ ..._.r. _ ��� <br /> ' -- FLORIDAS USS LOCAL FIRM <br /> PACE 24 RFQ12-04-02 <br />