|
I
<br /> NATALIA T. LERCARI, P.E.
<br /> I SENIOR PROJECT ENGINEER - TRAFFIC
<br /> I !
<br /> I
<br /> - REPRESENTATIVE PROJECTS:
<br /> •
<br /> •, 1-95 PD&E ST UDY PROJECT TRAFFIC FORECASTING. FDOT DISTRICT FOUR,
<br /> \' FORT LAUDERDALE,FL
<br /> 1 . i . Senior Protect Engineer: Responsible for analyzing and preparing the traffic forecasts.for
<br /> opening year 2015; interim year 2025, and the design year 2035. for the project model.
<br /> that studied and considered the construction of Interstate-95. to be a six-lane expressway
<br /> in Saint Lucie and Indian River Counties. The project limits extend south of SR-
<br /> 70/Okeechobee Road to north of CR-512/Fellsmere Road. The project forecasting was
<br /> NATALIA LERCARI, Project Manager, has based on Treasure Coast Regional Planning Model (TCRPM). historical trends. and
<br /> Traffic Analysis Zone (TAZ) zonal data information. Other responsibilities included
<br /> significant transportation engineering evaluating different alternatives, which were proposed,that included a new interchange at
<br /> experience for both public and private CR-606/Oslo Road in Indian River County.
<br /> sector clients, since 2001. She currently
<br /> provides transportation engineering DIS'I'RICII\'IDE TRAFFIC OPERATIONS & SAFETY CONTRACT, FDOT
<br /> services, such as travel demand DISTRICT 6, MIAMI.FL
<br /> forecasting; traffic signal warrant studies, Project Engineer: Responsible for preparing safety studies.qualitative assessments,signal
<br /> 1 warrant analysis. intersection analysis. arterial analysis, left-turn phase warrant analysis,
<br /> interchange and intersection operational
<br /> analyses; Development of Regional Impact supplemental tasks and fatal crash reviews, on this Work Order based, five-year contract.
<br /> studies; Interchange Justification Reports; with a total value of 51.5 million. Duties for multiple safety study projects required the
<br /> analyses of a particular segment of highway between one-half and one mile in length. The
<br /> 1 corridor studies; simulation modeling; work associated with the arterial safety review involved plotting data performing specific
<br /> signal timings and traffic impact studies,. analysis utilizing specific software. including modeling traffic demand, and developing
<br /> and traffic operational analyses for various several alternatives to solve each problem. The work also involved operational
<br /> projects. In addition, and through her characteristics of intersections and/or segments of arterials. conducting field reviews.
<br /> I
<br /> growth within our organization and with
<br /> our clients, Ms. Lercari has elevated her collecting data observations of the operation. assembling crash data performing
<br /> engineering analysis and associated benefit/cost analyses of various alternatives.
<br /> experiences and, in fact, is a Project
<br /> Manager on several municipal continuing GARDEN AVENUE AT BUNKER ROAD INTERSECTION SAFETY STUDY, Cm'OF
<br /> services contracts. In this role; she {PEST PALM BEACH,WEST PALM BEACH.FL
<br /> manages the day-to-day activities, and Project Manager: Responsible for evaluating safety issues at the intersection of Garden
<br /> Avenue and Bunker Road. Investigated and documented existing traffic operations and
<br /> individual task order assignments. safety conditions at the study intersection. Tasks included a signing and pavement
<br /> I •
<br /> marking evaluation, review of historical crash data sight distance analysis, a speed study
<br /> alone Bunker Road, and an all-way stop warrant analysis. Determined the need for the
<br /> relocation and installation of parking prohibition signage, and the relocation of stop lines.
<br /> to improve vehicular sight distance from the minor-street approach.
<br /> IHANSON STREET PROJECT,CITY OF FORT MYERS, FORT MYERS,FL
<br /> Project Engineer: Responsible for various design alternative evaluation& and traffic and
<br /> transportation planning services for the Hanson Street corridor, from US-41 to SR-82.
<br /> PROFESSIONAL QUALIFICATIONS: This project required the development of an Air Rights Agreement. to be submitted to
<br /> Florida Highway Administration for approval. Other responsibilities included traffic
<br /> EDUCATION: Bachelor of Science in Civil modeling. as part of the Air Rights Agreement, using the Florida Standard Urban
<br /> I and Environmental Engineering, Florida
<br /> International University,2001 Transportation Model Structure (FSUTp1S), and preparing intersection analyses and
<br /> arterial analyses. Additional tasks completed alone the Hanson Street corridor, included
<br /> the following: Access management features/plans; bicycle lane review; preparation of
<br /> REGISTRATIONS: Professional Engineer_,. traffic signalization plans: signing and pavement marking analyses and plans; and signal
<br /> I Florida,2008 • warrant analyses.
<br /> FORT MYERS CITYWIDE PARKING STUDY,on.OF FORT MYERS, FORT MYERS,
<br /> FEARS EXPERIENCE: // FL
<br /> YEARS WITH MCMAHON: 9 Protect,Manager: Responsible for preparing the study/report. which included identifying
<br /> II OFFICE LOCATION: {1'esrPohn Beach the optimum locations for new parking facilities and opportunities to improve or increase
<br /> existing parking supplies. within the entire downtown area. Other responsibilities include
<br /> assessing traffic performance measures for: transit availability and pedestrian/bicycle
<br /> connectivity to preferred parking facility sites.
<br /> iAMcMAHON CITY OF SUNNY ISLES BEACH
<br />
|