My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Coastal Systems
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 4:49:21 PM
Creation date
2/3/2016 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 1,2012 <br /> Co ix1. <br /> City of Sunny Isles Beach <br /> .Y""._I Request for Qualifications <br /> ,15:S Continuing Professional Architectural & <br /> �'11:'��� Engineering Services Firms Only(CCNA) <br /> ® pans. RFQ No.: 12-04-02 <br /> Page 35 <br /> 4.APPROACH AND METHODOLOGY <br /> The Coastal Systems team will utilize project management and <br /> delivery methods for the City of Sunny Isles Beach that has <br /> been successful with other local municipalities over the years. <br /> These strategies have included the following: <br /> • Define appropriate scope of services and project <br /> implementation plan with schedule. <br /> • Conduct Project Kick-off meeting to ensure the City's <br /> requirements are identified in the early stages of the project. <br /> • Begin the environmental permit application process as quickly <br /> as possible to begin the time clock on permitting. <br /> • Maintain open communication with regular updates to the City <br /> on the permit processing. <br /> • Involve the City in all agency negotiations throughout the <br /> permit process to ensure that City staff hears the agency <br /> concerns first-hand. <br /> Coastal Systems is accustomed • Prepare comprehensive responses to agency Requests for <br /> to providing technical depth Additional Information (RAI). <br /> ® and manpower to address • Begin Design Development and Construction Documents as <br /> these issues on a timely basis the permitting are being confirmed through the process. <br /> to keep the permitting process • Drainage System Design - Once the site conditions are <br /> moving forward as y <br /> environmental permitting is understood, then the proposed improvements need be overlaid <br /> most always on the critical onto the existing conditions so the grading and drainage can be <br /> path of the project schedule. designed. Modern civil engineering tools such as Civil3D can <br /> be utilized to provide cut/fill, roadway alignment and cross <br /> sections for earthworks calculations. <br /> • Ideally the project can be advertised for bids just as <br /> environmental permits are issued. <br /> • Attend City Commission Meetings if necessary to assist City <br /> staff with updates on project schedule and implementation. <br /> • Assist the City in compiling construction documents to <br /> account for the special requirements of construction in South <br /> Florida. <br /> • Assist the City in the bidding process and reviewing bids to <br /> select a qualified, selected contractor. <br /> • Assist the City in providing construction administration to <br /> ensure the project is completed in accordance with the plans <br /> and specifications. <br /> 41) <br /> Corponte Office: 464 South Dixie Highway•Coral Gables,Florida 33146•Tell 305661.3655•Far 325661.1914 <br /> Regional Office,, 2247 Visu Parkway,Suite 1:'1•Sat Palm Beach;Florida 33411•Tel:561-64&1X3•Fax:561-643-1S9 <br /> w-n maty rntwiivttom.mfogcouuhlste snnt.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.