My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alta Management - Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Alta Management - Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 4:50:17 PM
Creation date
2/3/2016 4:50:17 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Guillermo 'Bill' Prado <br /> EXPERIENCE <br /> 2001 to Present ALTA MANAGEMENT, INC. <br /> President and Owner <br /> • Program Management and Procurement services for the Chateau Maplewood Condominium <br /> Project in Montreal, Canada. The Project consists of the remodeling of an existing 'Historical <br /> Structure', built in 1925. The 142 Unit, very high-end Project has a total budget of$180 Million and <br /> a LEED Silver potential rating. Construction is expected to start in the summer of 2012. <br /> • Construction Manager for the Arte City Project in Miami Beach, Florida. Total Project cost of <br /> $43 Million. Project consisted of a total of five buildings, a 6 story, 55 unit tower, a 5 story, 57 unit <br /> tower and three stand alone two story, "historical" buildings with 28 units, for a total of 140 units. <br /> The Project included a one level, 'underground basement' parking garage. <br /> • Construction Manager/ Contractor for the 40 story, 207 Unit, The CONTINUUM Phase II <br /> Condominium Project in Miami Beach, Florida. Total Project cost volume was $200 Million. Alta <br /> was the Construction Manager for the Tower and also acted as the General Contractor for the <br /> foundations of the Tower, the adjacent Pavilion Restaurant, Cabanas and the Main Pool. The <br /> Project was successfully completed in March of 2008. <br /> • Program & Construction Manager for the 48 story, 386 Unit, AKOYA Condominium Project in <br /> Miami Beach, Florida. The Project included an adjacent 6 story parking garage. Total cost was <br /> $175 Million. The Project began in December of 2002 and was successfully completed by <br /> December of 2004. <br /> • General Contractor for the Spinnaker Bay Phase III residential Project in Boynton Beach, <br /> Florida. The Project consisted of 157 high-end single family homes. <br /> • General Contractor for a new high-tech surgical clinic for Premiere Center for Cosmetic <br /> Surgery in Weston, Florida. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.