• CITY OF SUNNY ISLES BEACH
<br /> SECTION-:.TwcY QUALIFICATIONS
<br /> Another often overlooked site plan element is internal The Division's current services include:
<br /> • accessibility for emergency vehicles, trash collection
<br /> vehicles, and other large trucks. The design of on-site • Geometric design
<br /> traffic circulation, curb return radii, and lane and parking • Signing and pavement marking
<br />• aisle widths all contribute to the overall functionality of the • Signal design
<br /> site. If large trucks are unable to negotiate through the site • Lighting design
<br /> to access the building or strategically located dumpsters, • Drainage and scour analysis
<br />• the viability of the development is undermined. By carefully • Interchange design
<br /> evaluating the industry standard (AASHTO design vehicles) • Control plans
<br /> turning radii,the K&S Team can provide recommendations • Utility and railroad coordination
<br /> • regarding how to best improve internal flow and circulation • Pavement design and safety reviews
<br /> of the site, which as a byproduct will also improve safety • Value Engineering
<br /> • and prevent damage to landscaped islands, curbing and
<br /> • signs. This is just one example of the careful and detailed A typical scope of services may include roadway analysis
<br /> traffic engineering review regularly conducted by our staff, and plans production,drainage analysis,utility coordination,
<br /> • and which can be of much benefit to Sunny Isles Beach. acquisition of engineering and environmental permits,
<br /> • signing and pavement marking analysis and plans production,
<br /> With the depth of experienced staff available on the K&S signalization analysis, signal plans, roadway lighting analysis
<br /> Team, the advantages offered to Sunny Isles Beach consist and plans production, bid administration, and post design
<br /> • of access to highly qualified staff in a wide variety of services. Our considerable experience can be of great
<br /> transportation services, and exceptional response time. assistance to Sunny Isles Beach as it maintains and upgrades
<br /> Usually,a technical site plan review requires approximately its infrastructure to continually serve its residents.
<br /> • one week from when the request is received to when the
<br /> review is completed and a memorandum is sent to the City's ROADWAY ANALYSIS AND PLANS
<br /> e project manager summarizing the comments. However,we PRODUCTION
<br /> • recognize that unusual instances occur when a shorter
<br /> response is needed,and K&S has the technical ability,depth, The K&S Team has extensive experience and expertise
<br /> e and commitment to serve the City on a moment's notice. evaluating all aspects of the roadway design process,
<br /> • Communication from the outset of such a need is critical including the development of typical sections, flexible
<br /> and information regarding schedule and key issues is always and rigid pavement designs, access management, and
<br /> identified during the initial contact with the City's project horizontal and vertical alignment features.Strict compliance
<br /> • manager. with applicable design criteria is continually reviewed
<br /> • Upon the identification of the project's due date and the throughout the process. If components of the design are
<br /> selection of the most appropriate personnel, the technical found to be in conflict with applicable design criteria, K&S
<br /> • components of the review occur. K&S' personnel are formally identifies and documents the issue,and prepares a
<br /> i highly proficient and knowledgeable regarding the City's recommendation to address the deficiency. This procedure
<br /> land development code and regularly coordinate with the s used to determine a reasonable application of design
<br /> • Florida Department of Transportation and Miami-Dade variances and design exceptions.
<br /> County,where our existing relationships will benefit Sunny We also have produced numerous roadway plan documents
<br /> Isles Beach.
<br />• from simple roadway improvement concept sketches
<br /> A ROAD SERVICES/HIGHWAY and master plans to complete roadway final plans. Final
<br /> plans typically include such items as a Key Sheet, Drainage
<br /> ® ENGINEERING Map, Typical Sections, Notes and Details, Roadway Plans,
<br /> • Roadway Profiles, Cross Sections, Drainage Details,Traffic
<br /> K&S' Highway Engineering Division provides engineering Control Plans,and Storm Water Pollution Protection Plans.
<br /> and related services on all types of highway and road K&S engineers are certified in Advanced Work Zone Traffic
<br /> • projects. We have designed access roads in residential Control as required by FDOT for projects on FDOT
<br /> areas,multi-lane divided expressways with bridges,and tolls roadways.
<br /> 5 and interchanges for the FDOT,county,and municipal road
<br /> • departments.
<br /> S
<br /> ® _ ,i.KEITH and SCH\ARS,P.A.
<br /> F-•.. l�]��_'
<br /> amok i31f Loot FIRM
<br /> 1/ RFC)._1 PAGE 11
<br />
|