Laserfiche WebLink
• CITY OF SUNNY ISLES BEACH <br /> SECTION-:.TwcY QUALIFICATIONS <br /> Another often overlooked site plan element is internal The Division's current services include: <br /> • accessibility for emergency vehicles, trash collection <br /> vehicles, and other large trucks. The design of on-site • Geometric design <br /> traffic circulation, curb return radii, and lane and parking • Signing and pavement marking <br />• aisle widths all contribute to the overall functionality of the • Signal design <br /> site. If large trucks are unable to negotiate through the site • Lighting design <br /> to access the building or strategically located dumpsters, • Drainage and scour analysis <br />• the viability of the development is undermined. By carefully • Interchange design <br /> evaluating the industry standard (AASHTO design vehicles) • Control plans <br /> turning radii,the K&S Team can provide recommendations • Utility and railroad coordination <br /> • regarding how to best improve internal flow and circulation • Pavement design and safety reviews <br /> of the site, which as a byproduct will also improve safety • Value Engineering <br /> • and prevent damage to landscaped islands, curbing and <br /> • signs. This is just one example of the careful and detailed A typical scope of services may include roadway analysis <br /> traffic engineering review regularly conducted by our staff, and plans production,drainage analysis,utility coordination, <br /> • and which can be of much benefit to Sunny Isles Beach. acquisition of engineering and environmental permits, <br /> • signing and pavement marking analysis and plans production, <br /> With the depth of experienced staff available on the K&S signalization analysis, signal plans, roadway lighting analysis <br /> Team, the advantages offered to Sunny Isles Beach consist and plans production, bid administration, and post design <br /> • of access to highly qualified staff in a wide variety of services. Our considerable experience can be of great <br /> transportation services, and exceptional response time. assistance to Sunny Isles Beach as it maintains and upgrades <br /> Usually,a technical site plan review requires approximately its infrastructure to continually serve its residents. <br /> • one week from when the request is received to when the <br /> review is completed and a memorandum is sent to the City's ROADWAY ANALYSIS AND PLANS <br /> e project manager summarizing the comments. However,we PRODUCTION <br /> • recognize that unusual instances occur when a shorter <br /> response is needed,and K&S has the technical ability,depth, The K&S Team has extensive experience and expertise <br /> e and commitment to serve the City on a moment's notice. evaluating all aspects of the roadway design process, <br /> • Communication from the outset of such a need is critical including the development of typical sections, flexible <br /> and information regarding schedule and key issues is always and rigid pavement designs, access management, and <br /> identified during the initial contact with the City's project horizontal and vertical alignment features.Strict compliance <br /> • manager. with applicable design criteria is continually reviewed <br /> • Upon the identification of the project's due date and the throughout the process. If components of the design are <br /> selection of the most appropriate personnel, the technical found to be in conflict with applicable design criteria, K&S <br /> • components of the review occur. K&S' personnel are formally identifies and documents the issue,and prepares a <br /> i highly proficient and knowledgeable regarding the City's recommendation to address the deficiency. This procedure <br /> land development code and regularly coordinate with the s used to determine a reasonable application of design <br /> • Florida Department of Transportation and Miami-Dade variances and design exceptions. <br /> County,where our existing relationships will benefit Sunny We also have produced numerous roadway plan documents <br /> Isles Beach. <br />• from simple roadway improvement concept sketches <br /> A ROAD SERVICES/HIGHWAY and master plans to complete roadway final plans. Final <br /> plans typically include such items as a Key Sheet, Drainage <br /> ® ENGINEERING Map, Typical Sections, Notes and Details, Roadway Plans, <br /> • Roadway Profiles, Cross Sections, Drainage Details,Traffic <br /> K&S' Highway Engineering Division provides engineering Control Plans,and Storm Water Pollution Protection Plans. <br /> and related services on all types of highway and road K&S engineers are certified in Advanced Work Zone Traffic <br /> • projects. We have designed access roads in residential Control as required by FDOT for projects on FDOT <br /> areas,multi-lane divided expressways with bridges,and tolls roadways. <br /> 5 and interchanges for the FDOT,county,and municipal road <br /> • departments. <br /> S <br /> ® _ ,i.KEITH and SCH\ARS,P.A. <br /> F-•.. l�]��_' <br /> amok i31f Loot FIRM <br /> 1/ RFC)._1 PAGE 11 <br />