|
ACAI Associates,Inc.
<br /> 2937 W.Cypress Creek Rd.Suite 200
<br /> Project Construction Manager Fort Lauderdale,FL 33309
<br /> CHARLES H. WILSON, CGC 954.484.4000 ACAI
<br /> www.acaiworld.com ,.�. ... . ..........
<br /> EDUCATION Lindsey Hopkins Technical Education L.E. THOMAS COURTHOUSE CENTER
<br /> Center Miami, Florida
<br /> ACAI provided full on-site ADA design services for this
<br /> REGISTRATION Florida CGC Lic. # CGC1517786 30-story county courthouse, including ADA accessibility
<br /> Journeyman Carpenter, South Florida surveys for parking, entrances/exits, public areas, doors,
<br /> Carpenters Regional Council protruding objects, ramps, elevators/lifts, signage,
<br /> drinking fountains, courtroom furnishings, etc.Additionally,
<br /> EXPERIENCE ACAI conducted peer reviews of existing survey reports
<br /> Charles H. Wilson has over 26 years of experience in provided by the Owner in order to prepare a preliminary
<br /> Construction Management and is responsible for ACAI's cost estimate for the removal of architectural barriers.
<br /> Construction Administration Post-Design Services.
<br /> Charles has extensive field experience and first-hand FIU ROOF ASSET MANAGEMENT PROGRAM
<br /> knowledge is one of his greatest assets to ACAI. Miami, Florida
<br /> The following is a list of selected project experience: ACAI is providing roofing consultation services for
<br /> Florida International University. including a Roof Asset
<br /> MIAMI LAKES CONTINUING SERVICES CONTRACT Management Program (RAMP). ACAI provides a Roof
<br /> Miami Lakes, Florida Abstract (RA) which provides a baseline of knowledge
<br /> ACAI provided Planning, design, permitting, bidding, on each building and establishes its condition at the time
<br /> management, construction administration, and inspection of the visit. The RA includes a roof plan sketch, pictures
<br /> services for the following architectural projects: Royal of the building and provides a general overview of the
<br /> Oaks Park Community Center, Police Sub Station, New deck at a glance, identifying the building and the roofing
<br /> Gymnasium and Community Pool at Miami Lakes Park, installer, the size and type of roof and the status of the
<br /> Town Hall 2nd Floor Alterations and Royal Oaks and Miami warranty in place. During the preparation of the RA,ACAI
<br /> Lakes Park Design Criteria Services. conducts the first semiannual inspection and prepares a
<br /> roof conditions report. ACAI then conducts semiannual
<br /> MIRAMAR ANSIN PARK COMMUNITY CENTER visits. A report identifying noted concerns is then issued
<br /> Miramar, Florida along with a recommendation for repair work.
<br /> This one story,9,000 s.f.facility is the second phase toAnsin FORT LAUDERDALE A/E CONTINUING CONTRACT
<br /> Park. Its main function supports daily park administration,
<br /> the adjacent 5,000-seat track and field area, baseball Fort Lauderdale, Florida
<br /> pavilion and serves as a community center. This facility ACAI is providing architectural design services to help
<br /> was designed in a Mediterranean style to complement and ease a backlog of work assigned to City staff; including
<br /> follow the style standards of the city. analysis and design modifications for ADA compliance at
<br /> City facilities; space studies; building analysis with respect
<br /> GSA A/E IDIQ CONTRACT to maintenance and repair of existing facilities; Design of
<br /> Miami Region Capital Improvement Programs (CIP) projects; Review
<br /> ACAI Associates served under a 5 year(extended to 6 1/2 of plans and specifications for conformance to City and
<br /> years) Open End, Indefinite Delivery/Indefinite Quantity other standards; Architectural analysis and reports and
<br /> Contract with the GSA to provide unlimited Architectural/ construction observation.
<br /> Engineering and Construction Management services. HURRICANE WILMA REPAIRS
<br /> The work included Courthouses and Federal Buildings
<br /> throughout the Southeast Florida region. The contract Broward County, Florida
<br /> was later expanded to include work at the Golden Collum In the aftermath of Hurricane Wilma, the County made
<br /> Federal Building & Courthouse in Ocala, Florida as well emergency selection of three design professionals to aid in
<br /> as work at South Florida airports for the Transportation the rebuilding process.ACAI was contracted to assist with
<br /> Security Administration (TSA). Provided services included damage assessment and full design services to county
<br /> Architectural/Engineering, Interior Design, Historic facilities including the BSO Jail and Stockade, North
<br /> Preservation, Planning, Programming, Structural repairs Broward Detention Center, Northwest Branch Library,
<br /> and Construction Management. Vinnette Carroll Theatre and 19th Street Mental Health
<br /> Facility.
<br /> City of Sunny Isles Beach I Request for Proposal No. 12-04-02 50
<br /> mi
<br />
|