Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br /> 18070 Collins Avenue <br /> Sunny Isles Beach,Florida 33160 S $NY'sE <br /> j. <br /> APPROACH/METHODOLOGY 305.947.0606 <br /> • <br /> www.sibfl.net 5( " <br /> .t <br /> F SUN <br /> PROJECT APPROACH Upon approval of the Schematic ■ <br /> Design, we will proceed into the /Ja <br /> In its twenty-seven year history, ACAI has designed Design Development Phase. <br /> numerous facilities throughout the State of Florida that Here we will refine the design 0 %=/ <br /> meet the Florida Building Code: From small interior by providing typical construction <br /> remodeling to designing, programming and delivering details, finishes and an Outline V <br /> entire facilities. This makes us very attuned to all Specification. / <br /> procedures and requirements. Our project experience Vii•' <br /> spans over three decades and our projects have included Upon approval of the Design <br /> new buildings and additions and includes the following Development Phase, we will <br /> services: Master Planning, Programming, Architecture, provide the Construction Documents (CD's) and Final <br /> Engineering, Landscape Architecture, Construction Specifications to establish in detail, the level of quality of <br /> Administration and Management, Cost Estimating, Need materials and systems for the Project. These CD's will <br /> Assessment Reports, Feasibility Studies, Roofing then be used for Bidding the Project through the competitive <br /> Consultation and Interior Design. process. <br /> The ACAI Design Team will plan a project charrette with During the Bidding Phase, we will answer Contractor's <br /> the staff and other user groups involved. We will listen to questions, attend a Pre-Bid Conference, issue an <br /> the groups as they present their thoughts about the Addendum, and if requested, submit the CD's to the <br /> proposed projects.This technique is a method of consulting Building Department for Permit. <br /> with all stakeholders and for them to express their ideas. <br /> A successful charrette promotes joint ownership of ACAI in addition to being architects, also maintains a <br /> solutions and allows all who participate to be mutual General Contractors License which allows us to apply for <br /> authors of the plan. the Permit. By doing this during the Bidding Phase, any <br /> permit questions can be resolved and any modifications, if <br /> Upon completion of the group meeting, our Design Team required, can be issued to the Bidders by Addendum so <br /> will compile all the expressed ideas into a combined that the Bid Price includes all costs and requirements.This <br /> presentation to the group. Our Design Team will present allows an Award of the Construction Contract may be <br /> a vision of the participants for all to see. made without any increase in cost. We will attend the Bid <br /> Opening, review the bids and make a recommendation to <br /> The resultant plan of the final presentation will be the basis the City concerning the award of the Construction Contract. <br /> of the Program for the project. This plan can then be <br /> presented to the Commission for their concurrence. After the Award, ACAI will provide Construction <br /> Administration services to assist the City in administering <br /> Upon the Commission's approval the ACAI Team will begin the Construction Contract. We will conduct a pre- <br /> the architectural design portion of the project. This construction conference and weekly project meetings. <br /> consists of three phases: Schematic Design, Design Review the Contractor's schedule, submittals and shop <br /> Development and Construction Documents. At the end of drawings. Report to the Building Official and Owner any <br /> each phase a statement of probable cost will be issued. violations of codes or substantial deviations from the <br /> contract documents that the architect observes. Prepare <br /> In the Schematic Design Phase, we will establish a necessary change orders and supplemental agreements. <br /> conceptual design illustrating the scale and relationship of Maintain copies of the Contractor's daily and weekly <br /> the program components to the existing building. It will project diaries. Review payment requests. Provide a final <br /> also include a conceptual site plan. Preliminary selections inspection and Certificate of Substantial Completion and <br /> of construction materials and systems will be presented. assemble final documentation and Contract close out. <br /> City of Sunny Isles Beach I Request for Proposal No. 12-04-02 65 <br />