My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACAI
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ACAI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2016 11:54:24 AM
Creation date
2/4/2016 11:52:46 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br /> 18070 Collins Avenue <br /> Sunny Isles Beach ,Florida 33160 sot"' <br /> APPROACH/METHODOLOGY 305.947.0606 <br /> www.sibfl.net v1444 <br /> o <br /> OF 10N BYO♦ <br /> Our workable VDC solutions optimize how projects flow services for Broward County is the Ravenswood <br /> and improve communication and collaboration enhancing Maintenance Facility. For this project, ACAI has adopted <br /> overall productivity for Owners and the entire design team. GSA BIM standards and procedures as a best practice <br /> Benefits of Virtual Design & Construction and BIM include: during design. With Broward County we are utilizing 4D <br /> Building Information Modeling("BIM")technology promotes Phasing to support the understanding of the projects <br /> efficiency and schedule compression; Enables integrated phasing. We have also adopted the use of gbxml data <br /> planning, design, detailing, cost control; Eliminates schemes for the exploration of sustainable design and <br /> inaccurate as-built documentation and inconsistent design energy modeling. During the Schematic Design Phase <br /> quality; Ensure better communication, design delivery and we utilize the Conceptual Energy Analysis tool within Revit <br /> coordination; Improves cost predictability and clash 2012 to explore design and building performance <br /> detections and Post-construction efficiencies optimization. The parameters of the BIM begin at a Level <br /> (maintenance). of Detail (LOD) of 100 and migrates to a LOD of 300 <br /> through the design process. Beyond construction <br /> Also, ACAI has an excellent File Transfer Protocol (FTP) documents we continue with the use of the BIM for <br /> system. We have recently upgraded to a 100 mpbs down construction. We understand the importance of open-BIM <br /> and 10 mpbs up broadband solution to speed up file - promote interoperability and support IFC, COBie, SPie, <br /> transfers. We use Box.net for our file sharing with our and the bsDD (building SMART data dictionary <br /> consultants and project members and we have worked development). <br /> with a number of different cloud file sharing solutions. We <br /> have migrated our FTP users to Box.net for the enhanced Also, ACAI served as the BIM consultant and modeler <br /> collaborative environment solution they offer. We have responsible for coordination of all systems for a DEA Lab <br /> researched other broadband options that would allow for which is currently under construction in South Florida. The <br /> faster upload speeds and we are currently waiting for them ACAI team worked as consultants for a national Electrical <br /> to be available in our area. In addition, subconsultants contractor on this project and was responsible for modeled <br /> have been working with ACAI currently with large files with the Lighting, Power Fire Alarm, and the low Voltage <br /> Box.net and ACAI would be agreeable to make it a project systems based on the engineering drawings. Through a <br /> requirement that they procure a broadband solution with series of on-site meeting with all the parties involved and <br /> higher upload and download speeds if they don't currently using the latest Autodesk product tailored for such a task, <br /> have a minimum of 10 mbps upload and download. ACAI ACAI coordinated the electrical Systems against all the <br /> has not had any issues with any current consultants in other trades including Plumbing, HVAC,and fire Sprinklers. <br /> working with files that are typically between 250 and 500 The result is a preconstruction fully coordinated 3D BIM <br /> MB>. model of what will be installed. <br /> Our BIM Experience can be seen firsthand as ACAI served At ACAI, we are constantly examining the structure of the <br /> as the BIM Manager for the first BIM Project to be "Information" within the BIM model to ensure its <br /> completed for Broward County. As BIM Manager, ACAI organization, usefulness and eventual migration to <br /> was responsible for the BIM implementation & execution Facilities Management. The ACAI Team focuses on the <br /> plan and kept all team members informed of BIM Standards Life Cycle of the BIM model in order to bring maximum <br /> and processes. We worked with Broward County staff, the client value. While the industry continues to appreciate <br /> project's General Contractor and Design Team to establish and expand the potential value of BIM in the design and <br /> the operating procedures and guidelines for creating BIM construction process, the emergence of this technology <br /> coordination files for the Central BIM Model and managed has also accelerated interest in the development of the <br /> the model handover and exchanges during the pre- integrated project delivery system which embraces the <br /> construction and construction process. We were also Owner, Contractor, Architect and other entities in a very <br /> responsible for the final record as-built BIM. highly collaborative project. Together, BIM and integrated <br /> project delivery are seen by many as the wave of the <br /> Another project where ACAI is currently providing BIM future. <br /> City of Sunny Isles Beach I Request for Proposal No. 12-04-02 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.