Laserfiche WebLink
ICivil/Environmental Engineering I 2-11 <br /> Town of Medley Drainage &&ICONS <br /> I Improvements <br /> I Medley, Florida <br /> NW 138th Way Street Drainage and This project was completed in conjunc- '�� of <br /> Roadway Improvements Project tion to a Miami-Dade County Public Works o • : `. <br /> I <br /> This project consisted of, but was not project, People's Transportation Plan (PTP) <br /> Construction of NW 138th Street Bridge G <br /> limited to, the complete roadway recon- over Miami River Canal. The same contrac- _ no!+ <br /> •struction and drainage improvements to tor completed both projects simultaneously. r ® .•' ' ;�' <br /> I NW 138th Street, a roadway located in the a 11 • <br /> Town of Medley, Florida.The proposed NW 116'h Way Drainage •` O t� r <br /> drainage system improvements consisted Improvements Project :.( ?` <br /> of 100 linear feet(LF)of exfiltration trench �_ R1D <br /> I that included 90 LF of 18-inch high density This project consisted of the installation of <br /> polyethylene (HDPE) perforated pipe, 2 drainage improvements along the north- <br /> drainage structures, and modifications to bound portion of NW 116th Way, a roadway Client <br /> existing drainage structures. The complete located in the Town of Medley, Florida. Town of Medley <br /> I roadway reconstruction of NW 138th Street These improvements consisted of, but were <br /> included rework of 12-inch of stabilized not limited to, the installation of approxi- Completion date <br /> subbase,geogrid fabric, new 10-inch limer- mately 440 linear feet(LF)of exfiltration 2012 <br /> ock base, 3 inches of SP-9.5 traffic level C trench having a high density polyethylene Project cost <br /> asphalt and pavement markings. (HDPE)perforated pipe with a diameter of 5400.000 <br /> 24-inches, 195 LF of 18-inch solid HDPE <br /> NW 138th Street was kept open during con- drainage pipe, 11 drainage structures and Services provided <br /> struction, therefore the MOT was adjusted the repair of the portions of NW 116th Way • Drainage <br /> m in order to keep a safe travel way and safe that were damaged during the construction <br /> construction site. of the drainage system. <br /> o•2x31.4"m ;5'_ Trenching for the exfiltration trenches <br /> 5. a was conducted during the evening and <br /> F d'i Si 2.; t early morning hours in order to lessen the <br /> ,,frr'4-1 -- - Hs. effects to the heavyvehicular traffic on <br /> ' "r, +.v,. '"' 4 , the roadway. <br /> Due to limitations to the depth of some of <br /> �i .z a� =• r s- ▪, the drainage structures, concrete flowable <br /> t• .• fill was used in between the top of the HDPE <br /> -".rra s"'S- ;.Ts sr • -i-t- pipe the bottom of the proposed curbing. <br /> v...T `cecwt".to .r ,r•'Vr <br /> NW 138th Way(above and below) <br /> , wy5 ,moo. -_"ler <br /> ^ . <br /> t ` <br /> • ... sF,-moi. ilit <br /> w NW 116th Way <br /> I <br /> IPlan Design Enable <br /> i0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02 <br />\I <br />