Laserfiche WebLink
Civil/Environmental Engineering 3-6 <br /> 1 <br /> I <br /> Victor Herrera, PE South Pointe Park Pier Project, City of Miami Beach, Miami Beach, FL.As lead <br /> Team Project Manager and civil engineer, Mr. Herrera is responsible for management of internal design groups and <br /> Project Programming subconsultants in the development of a new design for South Pointe Park Pier. In addition <br /> I to managing the design team, Mr. Herrera is responsible for client coordination as well as <br /> overseeing the permitting efforts with multiple agencies. The project is currently under design, <br /> and construction is anticipated to start in the fall of 2012. <br /> ® Life Science Park, Zimmer Gunsul Frasca Partnership, University of Miami, Miami, <br /> ® FL. Mr. Herrera is the project manager responsible for civil engineering design for site layout, <br /> utilities, stormwater management, and permitting of a LEED-rated, 210,000-sf medical research <br /> facility and office development.Atkins also provided construction services. <br /> Plan Review, City of Miami Springs, Miami Springs, FL. Mr. Herrera is responsible for the <br /> review of all plans submitted for development to the City of Miami Springs including reviewing <br /> architectural and civil engineering plans to verify compliance with local and state requirements. <br /> Publix Supermarkets Stores Nos., 1345, 1311, and 1302, South FL.Atkins provided civil <br /> engineering for three stores purchased by Publix from Albertson's. Publix gutted the stores <br /> and started all layouts, design and systems from scratch within the existing shell structures. <br /> The buildings were designed for 3 different southern Florida municipalities and involved <br /> .11 <br /> extensive permitting and zoning, as well as intensive coordination with Publix engineers and <br /> brand managers. As lead civil engineer, Mr. Herrera was responsible for the site layout, utility <br /> coordination, and permitting with local agencies. <br /> Miller Circle Roundabout, University of Miami, Miami, FL. Mr. Herrera serves as the <br /> project engineer for a 4-leg, 2-lane traffic circle/roundabout. His responsibilities include <br /> coordinating with the Department of Environmental Resources Management(DERM), Miami <br /> Dade County Public Works, and other permitting agencies. <br /> Snyder Tennis Center, City of North Miami Beach, Miami Beach, FL. Mr. Herrera serves as <br /> the engineer-of-record for a 10-acre park improvement project. The project consists of parking <br /> lot design, stormwater management, and water/sewer design. <br /> Force Main Rehabilitation, City of Tallahassee, Tallahassee, FL. Mr. Herrera served as <br /> resident engineer for a $9 million project for the water resource engineering group. The project <br /> consisted of pipe bursting 8,740 linear feet of 36-inch HDPE pipe through existing Hobas pipe, <br /> beneath Florida Department of Transportation (FDOT)roadway. His responsibilities included <br /> reviewing consultant drawings; reviewing consultant specifications and verifying compliance <br /> with the City's standard specifications; processing all contract administration paperwork <br /> (invoices, change orders, etc.); construction oversight; and scheduling. <br /> I, <br /> I <br /> I <br /> 0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02 <br />