My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Atkins - Civil
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Atkins
>
Atkins - Civil
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:53:19 PM
Creation date
2/5/2016 11:05:20 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Civil/Environmental Engineering 15-5 <br /> i <br /> MIAMI BEACH <br /> City of Miami Beach, 1700 Convention Center Drive,Miami Beech,Florida 33139,www.micmibeochfl.gov <br /> CAPITAL IMPROVEMENT PROJECTS OFFICE <br /> Tel:305673-7071,Fax: 305473.7073 <br /> 1 April 13, 2012 <br /> To Whom It May Concern: <br /> Atkins is currently serving as the Consultant for the new South Pointe Park Fishing Pier in <br /> Miami Beach. This project consists of demolishing the existing +10,000 square foot fishing <br /> pier and installation of a new pier supported by more than 60 reinforced concrete piles within <br /> the footprint of the non-serviceable pier. <br /> Atkins was selected for this project based on their experience in dealing with marine related <br /> projects as well as their extensive knowledge in coastal permitting with the State and Federal <br /> regulatory agencies. They have performed exceptionally well in providing their contractual <br /> services and have also gone the extra mile. <br /> Project highlights include: <br /> • Detailed design involving structural, civil, plumbing, electrical, landscape, and <br /> architectural components, all of which Atkins conducted in-house. <br /> • Meeting an aggressive design and permitting approval schedule <br /> • Applying and obtaining permits with City, County, State, and Federal agencies <br /> • Holding public meetings for nearby residents <br /> • Serving as advisor to the City during selection of the Construction Management firm <br /> Our project required a single firm that carried the experience and manpower to meet the <br /> critical deadlines and design of a pier that would meet the expectations of the residents of <br /> Miami Beach. I am pleased to say that Atkins has met the goals identified by City staff and <br /> their project team has provided a design that the City of Miami Beach can be proud of. <br /> Victor Herrera, PE has worked diligently on this project from the inception of the project, from <br /> planning through the permitting of several jurisdictional agencies. He has been instrumental <br /> in keeping the project on schedule and getting the permits approved. <br /> We are very pleased with Atkins and are excited to see our project under construction in the <br /> Fall of 2012. If you have any questions, please feel free to contact me directly at(305)673- <br /> 7071. <br /> Sincerely, <br /> Matilde E. Reyes, IRA <br /> 1 Sr. Capital Project Manager <br /> We me c_.ma1,ea r prv.;ai:g eae"en,cjh'c erica aro 5c:em^chc.-d=h_:is c-.•rbr_rr.r_c9cc).hisxv:c cc.-^vria <br /> 0006.027944.0512 Atkins I City of Sunny Isles Beath, RFQ No. 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.