Laserfiche WebLink
Architecture) 3-11 <br /> I <br /> 1 <br /> Education Pelayo Calante, PE LEED AP BD+C <br /> M.S., Nuclear Engineering, i <br /> Moscow Institute of Power MEP Engineering <br /> Engineering <br /> B.S., Nuclear Engineering, Pelayo Calante has 27 years of extensive experience in the fields of mechanical, nuclear, civil and <br /> Moscow Institute of Power environmental engineering, quality control, and design and project management. His varied <br /> Engineering career includes work as a mechanical engineer, nuclear engineer, civil engineer, environmental <br /> Registrations/Licenses engineer, and associate professor where he taught courses in nuclear power plants and the <br /> Professional Engineer construction and assembly of nuclear power plants. He has extensive knowledge of Florida <br /> (Mechanical): Building codes and other design codes including the National Fire Protection Association (NEPA); <br /> Florida, 53829, 1999 American Society of Heating, Refrigerating, and Air Conditioning Engineers(ASHRAE); and <br /> American Society of Mechanical Engineers(ASME). As group manager with Atkins, Mr. Calante <br /> Certifications is responsible for the management and/or production of mechanical/electrical/plumbing (MEP)- <br /> Leadership in Energy andelated projects. <br /> Environmental Design Mr. Calante's project experience with Atkins includes: <br /> Accredited Professional <br /> Building Design Plans Review and Inspection Services, Miami Dade College (MDC), Miami, FL. Mr. <br /> +Construction(LEED AP Calante served as mechanical engineer performing code-related plan reviews and inspection <br /> BD+C), U.S. Green Building services for various projects for all MDC campuses. Assignments have included the renovation <br /> Council (USGBC), 2008 of the gymnasium at the North Campus, Building 400, that consisted of reviewing the Phase III <br /> documents and performing inspections based on FBC; and plan reviews and code-inspection <br /> National Council of Examiners services for the SET and BURN buildings at the North Campus. Total construction cost for the <br /> for Engineering and Surveying aforementioned projects was more than $50 million. <br /> (NCEES), 47395, 2011 <br /> Wolfson Campus Building 9000, MDC, Culinary Art Building, Miami, FL. Mr. Calante <br /> was project coordinator of all disciplines(MEP and fire alarm/fire protection)for a new 8-story, <br /> 35,000-sf building. This urban infill building incorporates offices and classrooms, teaching labs, <br /> TV production studio, and a commercial restaurant. Work performed included the plumbing <br /> and fire protection engineer-of-record. All systems were coordinated to pursue LEED-New <br /> Construction(NC)Gold certification. <br /> White Sands Missile Range D-B of Company Operations Facilities (COF), White Sands, <br /> NM. Under a D-B MATOC contract, Atkins is providing D-B planning and programming, A-E <br /> design, site design, building and interior design, construction documents, and construction <br /> administration for a new, full-service, $15 million, single-story, 54,700-sf Company Operations <br /> Facility(COF). Design and construction will achieve LEED Silver certification, and the project is <br /> being executed under a highly compressed schedule—the Atkins team is providing three design <br /> packages over three months within a total D-B fast-track schedule of 16 months. Mr. Calante <br /> was responsible for supporting mechanical engineering for the D-B construction of the COF in <br /> accordance with ASHRAE Standard 90.1, USGBC LEED version 2.2, and EPAct 2005, including <br /> engineering/design reviewing/performance of heating/cooling load calculations. <br /> Before joining Atkins, Mr. Calante's work history included: <br /> Wolfson Campus Building 5000, Design of New Chiller and Electrical Generator, <br /> Miami-Dade County (MDC), Miami, FL. Mr. Calante served as project designer and project <br /> coordinator. The scope of work entailed installation of a new generator and chiller to facilitate <br /> load shedding with Florida Power and Light. <br /> Wolfson Campus New World School of the Arts, Building 5000 Lobby Remodeling <br /> and Mechanical Design, MDC, Miami, FL. As MEP Engineer, Mr. Calante was responsible <br /> for the project coordination of all disciplines (MEP and fire alarm/fire protection)for this project. <br /> Scope of work included the demolition of existing lobby/entry space and the remodeling and <br /> expansion of new entry and lobby space. Project entailed the modifications to the existing MEP <br /> infrastructure as well as the existing smoke evacuation systems. <br /> 1 0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02 <br />