Laserfiche WebLink
cA &, TES <br /> o <br /> ' process whereby we support the contractor in the proper execution of the project from start to <br /> finish. These items are: <br /> ' 1. Providing the client/contractor with a full set of documents as agreed with transmittals. <br /> 2. Coordinating and instituting the RFI system with the contractor and client. <br /> ' 3. Coordinating and instituting a submittal and shop drawing submission and approval process. <br /> 4. Coordinating site visits and inspections with the client/contractor. <br /> 5. Coordination for attendance of construction weekly meetings (if required by client or <br /> contractor). <br /> 6. "Migration' also includes successfully closing out the project at the time of construction <br /> ' completion. These items include: <br /> a. Oversee final inspections <br /> b. Approval of close-out documents such as warranties and manuals of operation. <br /> ' c. Assist the client and contractor with obtaining the Certificate of Occupancy if <br /> applicable. <br /> ' d. Coordinate with the contractor in order to provide the required as-builts. <br /> e. Provide other assistance to the contractor as may be needed. <br /> BUILD <br /> 'Build" is the only process that we have no control over but have included it in the "Method Sphere" <br /> as the ultimate last step in the standard progression of the design process. <br /> ' ( OVERALL ORGANIZATION TO COMPLETING PROJECTS <br /> Greg Batista. PE. CGC, LEED AP. CEM is the engineer that is in responsible charge of all the <br /> ' designs and projects that he and his company perform whether it's an inspection. a Structural or MEP <br /> design. Our success. even during these hard economic times. has been mostly due to the non- <br /> , ,-r compromising implementation of our afore-mentioned <br /> y V "Method Sphere" tactic for completing our engineering tasks. <br /> I <br /> The overall organization that is employed to attack a given <br /> =. engineering task revolves around the first step which is the <br /> . �� <br /> �_ ! � �;r v, "Sva[egy'. It is during this initial and critical phase that we <br /> r assess the scope of work and apply the appropriate resources <br /> 1` f for its successful and timely completion. Through the years. <br /> 2 Mr. Batista has been able to amass a pool of talent that are <br /> ' both full-time employees as well as hired consultants. <br /> CITY OF SUNNY ISLES BEACH <br /> RFQ No. 12.04-02 <br />