My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G. Batista - Structural
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
G. Batista
>
G. Batista - Structural
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 2:26:10 PM
Creation date
2/5/2016 2:26:10 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' C3 G. BAIISTA <br /> CL,, &ASSOCIATES <br /> zsOO <br /> 1 <br /> I ADDITIONAL REFERENCE LIST FOR GOVERNMENT PROJECTS <br /> PROJECT: Interior renovations to the Fort Lauderdale- Hollywood International Airport <br /> CONTACT: Manu Catherine Martin. Architect <br /> t (404) 880-9789 <br /> DESCRIPTION: Mr. Batista was the engineer of record having provided Mechanical, Electrical, <br /> ' <br /> Plumbing, Fire Alarm and Fire sprinkler engineering plans and calculations for the <br /> interior renovations at the Fort Lauderdale-Hollywood International Airport TSA <br /> Facilities. This included a complete renovation of the break area. offices and <br /> training rooms. <br /> PROJECT: Renovations for the Supervisor of Elections Facilities <br /> t CONTACT: Susan Goldstein <br /> Expansion Project Administrator <br /> Broward County Public Works Dept. <br />' 954-357-8060 <br /> DESCRIPTION: Mr. Batista and Broward County collaborated in providing the Supervisor of <br />' Elections with proposals for floor plans for 100.000 sf of new offices and warehouse <br /> facilities and providing preliminary MEP analysis of the proposed structure to <br /> determine the adequacy of the existing facilities. This proposal included a LEED <br />' study and structural inspection and analysis of the existing building to determine the <br /> constructability in converting the building into a Category Ill structure as per ASCE <br /> standards. <br /> 1 <br />' PROJECT: Miami Beach Housing Authority Multi-Unit renovations <br /> CONTACT: An Sklar. Architect <br />' 954-925-9292 <br /> DESCRIPTION: Mr. Batista was the engineer of record having provided Mechanical. Electrical and <br /> Engineering plans for a multi-unit residential facility for the Miami Beach Housing <br /> Authority located at 328 Jefferson Street, Miami Beach. <br /> CITY OF SUNNY ISLES BEACH <br /> RFQ No. 12-04-02 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.