Laserfiche WebLink
I <br /> Brian Shore, RLA <br />' street and commercial center.The initial included tree removal/mitigation and rather than replacing backout parking in <br /> streetscape plans included public landscape design. Miller Legg was a front of businesses for the safety of both <br /> involvement,re-doing the street and subconsultant to R1 Behar and Company. the pedestrian and automobile traffic <br /> I sidewalks in the Central Business District, and to improve the street operation and <br /> landscaping and irrigation and other Miramar Parkway Lane Reduction Study the aesthetics of the streetscape. <br /> improvements.Miller Legg worked with -Conducted study of impact of <br /> I the Florida Department of <br /> Transportation(FOOT)District 1 on this eliminating outside lanes on this one-half Sample Road Streetscape-Miller Legg <br /> mile segment of Miramar Parkway(SR7 prepared the planting and hardscape <br /> project. Plans were prepared according to SW 64 Avenue),therefore reducing design of this four-lane divided roadway <br /> to FDOT standards and reviewed by the the cross-section from a six-lane divided in Broward County.The design <br />' <br /> agency on several occasions.After to a four-lane divided roadway. Existing incorporated existing trees and palms <br /> several iterations of taking bids,the City and future operating conditions of and established a plant and paver <br /> determined that none of the bidders was segments and intersections along the palette theme for future roadways <br /> I responsive and has since modified the study corridor were analyzed. Future within the City of Coconut Creek. In <br /> scope of work to include a more limited demand was based on a combination of addition to landscape,irrigation and <br /> renovation to the sidewalks,lighting and historical growth rates and long-range hardscape designs,grant preparation <br /> I <br /> landscaping. model projections.This older,low- services were provided as part of this <br /> intensity retail,corridor reflects minimal project. As part of a miscellaneous <br /> City of Coconut Creek SR7/U5441 access management,with significant services contract with the City,Miller <br /> Landscape Beautification -A two-mile parking which backs directly onto Legg prepared the Florida Highway <br /> I segment of SR 7/US 441 from the Miramar Parkway. Miller Legg <br /> inventoried parking spaces and access Beautification Council Grant Application <br /> Sawgrass Expressway to the and developed Landscape Improvement <br /> Broward/Palm Beach County Line connections for all 31 parcels,studied Design Documents for Sample Road.This <br /> I through the City of Coconut Creek was weekday and weekend parking approximately three-mile roadway <br /> designed to enhance the existing mature occupancy and developed a conceptual serves as the major east-west corridor <br /> canopy trees through this corridor,as plan to improve safety and access through the City of Coconut Creek.The <br /> well as provide irrigation and hardscape management, eliminating back-out grant application was successful in <br /> I within the existing roadway medians. parking while providing additional acquiring$225,000 in matching funds for <br /> Conceptual plans served as exhibits to streetscape amenities and landscaping. the project. Award:Broward Beautiful <br /> obtain funding through a Broward Third Place for Roadway/Swale <br /> I Beautiful State Thoroughfare <br /> Beautification Grant Program. Miramar Parkway Redevelopment-This Beautification, Broward County, 2004 <br /> redevelopment and streetscape project <br /> Coordinated with SFWMD for a General included a two-mile,two-block urban The Waterfront-G9-Miller Legg <br /> Water Use Permit for irrigation along this section of the Miramar Parkway corridor provided landscape architecture for a <br /> I corridor.This landscape corridor design adjacent to SR 7/US 441. Miller Legg 725-acre urban mixed-use development <br /> is an integral part of the gateways into designed the landscape and irrigation in the Waterfront District of Dubai, <br /> City of Coconut Creek,as well as improvements for Florida Department of United Arab Emirates.The project area <br /> I Broward County;and provides an overall <br /> unified beautification enhancement for Transportation(FOOT)along this corridor includes six miles of urban streetscape, <br /> north and south of Miramar Parkway. In four miles of commercial and residential <br /> the corridor. addition,certified arborist services were waterfront,and three major urban parks. <br /> ' provided for a tree inventory and quality Services include conceptual through final <br /> City of Miami Buena Vista Heights evaluation. The proposed streetscape design plans for the project's landscape, <br /> Landscape-Miller Legg prepared improvements included enhancement of hardscape,irrigation,site furnishings, <br /> landscape architecture design plans for the pedestrian corridor to encourage water features,architectural amenities, <br /> I the City of Miami Buena Vista Heights safe pedestrian traffic for adjacent signage and lighting. This project was <br /> neighborhood. The neighborhood commercial and office uses.The design developed to achieve Gold LEED <br /> roadway improvements project area also calls for consolidated parking areas Certification. <br /> I <br /> I <br /> I <br /> I <br />