Laserfiche WebLink
I <br /> Mark Brandenburg, MS, CSE. PWS <br /> Program)from 1996-2000.These phases invertebrate identification, seagrass project in the City of Miramar. The <br /> involved (1)pre-dawn surveys along survey,mitigation credit determination, project entails two segments of Miramar <br /> various segments of Broward County and permitting with the US Army Corps Parkway:the eastern gateway segment <br /> I shoreline to indentify sea-turtle"crawls" of Engineers,Florida Department of from 62nd to 64th Avenue and the mid- <br /> and nests. When nests were identified, Environmental Protection,South Florida town commercial segment from 68th to <br /> eggs were removed from nests and Water Management District,and 69th Avenue. The project includes <br /> I relocated to protected hatcheries Broward County Environmental intersection improvements and sidewalk <br /> (enclosed with fencing or open, "roped Protection Department.The seagrass and landscape beautification throughout <br /> off"areas); (2)After gestation period, survey was conducted using scuba diving the project limits. Services provided <br /> hatchery nests were examined in the and digital global positioning satellite include: surveying including topographic <br /> I evening on daily basis. On days when equipment and included surveying,underground utility <br /> hatching occurred,hatchlings were transect/quadrant measurements of designation,landscape architecture, <br /> assisted out of nest when necessary,and seagrass density,abundance,and hardscape design,drainage and <br /> total number of viable hatchlings(vs. frequency of occurrence. stormwater permitting,design and <br /> original egg count)was documented. management, lighting and electrical <br /> U.S.Coast Guard Station Seagrass design,geotechnical design,traffic <br /> Florida Department of Transportation Survey of Boat Basin-Seagrass beds are engineering,tree permitting and arborist <br /> I (FOOT) District 4 SR AlA/SE 17th Street critical marine habitats found in near- services,as well as LAP coordination, <br /> Causeway-Miller Legg performed shore coastal areas. Impacts to permitting and submittal <br /> permitting of the open water impacts protected seagrass beds are regulated by documentation. <br /> I which were associated with installation state and federal environmental <br /> of a new high-level bridge over the protection agencies. Consequently, Florida Department of Transportation <br /> Intracoastal Waterway in Fort coastal development projects typically (FDOT) District 4 Sheridan 400 Sidewalk <br /> Lauderdale. require an assessment of benthic(sea- - Permitting for wetland impacts <br /> Ifloor)habitats to determine the associated with construction of a new <br /> Florida Department of Transportation presence of seagrasses. For this sidewalk along Sheridan Street.Services <br /> (FDOT) District 4 West Lake Park Dania particular project, Miller Legg performed provided included:gathering of <br /> I Beach Bridge Mitigation-An seagrass surveys that were needed to background data,off-site wetlands <br /> approximately one-acre saltmarsh ensure that reconstruction of the basin mitigation procurement,conducting <br /> wetland enhancement project in bulkhead would not result in damage or coordination meetings, permitting <br /> I Broward County.The purpose of the•project was to mitigate for seagrass destruction to seagrass beds. through US Army Corps of Engineers, <br /> Broward County Environmental <br /> impacts caused by bridge enhancements. Miami Beach Coastal Construction Protection Department,and South <br /> Services provided included:design, Control Line Survey-Miller Legg was Florida Water Management District. <br /> permitting,contractor coordination and hired to obtain a permit from the Florida <br /> field inspection/photo documentation, Department of Environmental Protection Hollywood Site 157-Environmental- <br /> construction observation of grading, (DEP)for a landscape beautification For this 6.3-acre parcel in Hollywood <br /> I earthwork activities,and hydrophyte project designed for the City of Miami <br /> Beach. The permit will allow landscape containing freshwater and brackish <br /> installation. environments located adjacent to a <br /> improvements of desirable,native plant South Florida Water Management <br /> West Lake Park II- Environmental species that will both create habitat and District canal,Miller Legg assessed the <br /> O Services-Miller Legg is the prime erosion. In addition,we natural resources,established wetland <br /> consultant for the permitting and design performed a survey to confirm the jurisdictional determinations,analyzed <br /> of enhancements for the second phase presence of monuments that define the wetland quality and permitting <br /> I of this 1,500-acre estuarine wetland. State's Coastal Construction Control Line requirements,analyzed development <br /> Services provided included:paving and (CCCL),as well as collect survey data for potential as well as restoration potential, <br /> drainage improvements for the nature other"lines"such as the mean high tide and permitting and mitigation <br /> center and associated parking lot,design and low tide lines. Miller Legg was a requirements. This project is a result of <br /> I of three sewage pump stations,water subconsultant to AECOM. Broward County's$400 million bond <br /> distribution system design,sanitary referendum in 2000 that was used to <br /> sewage collection and transmission Miramar Parkway LAP Streetscape preserve and reclaim almost 1,500 acres <br /> system design,off-site force main,traffic Improvements from 62nd to 64th of conservation land,green space,and <br /> engineering,surveying,water quality Avenue and 68th to 69th Avenue- open space;and,repair and enhance the <br /> data analysis,hypothesis development Miramar Parkway Streetscape aging park system to provide safer parks. <br /> and review,sediment analysis,fishery Improvement project is a Local Agency <br /> analysis,rip-rap design,benthic macro- Program(LAP)-funded revitalization <br /> \�% <br /> I <br />