My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G. Batista - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
G. Batista
>
G. Batista - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 3:39:53 PM
Creation date
2/5/2016 3:39:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 0 <br /> 4. Coordinating site visits and inspections with the client/contractor. <br /> 1 5. Coordination for attendance of construction weekly meetings (if required by client or <br /> contractor). <br /> 6. "Migration" also includes successfully closing out the project at the time of construction <br /> 1 completion. These items include: <br /> a. Oversee final inspections <br /> b. Approval of close-out documents such as warranties and manuals of operation. <br /> 1 c. Assist the client and contractor with obtaining the Certificate of Occupancy if <br /> applicable. <br /> 1 d. Coordinate with the contractor in order to provide the required as-builts. <br /> e. Provide other assistance to the contractor as may be needed. <br /> 1 BUILD <br /> "Build" is the only process that we have no control over but have included it in the "Method Sphere" <br /> as the ultimate last step in the standard progression of the design process. <br /> 1 ( OVERALL ORGANIZATION TO COMPLETING PROJECTS <br /> 1 G. Batista & Associates is the firm that would be in charge of all the designs and projects that the <br /> Team will perform whether it's an inspection. a traffic study or a roadway improvement design. Our <br /> success. even during these hard economic times, has been mostly due to the non-compromising <br /> 1 implementation of our afore-mentioned "Method Sphere" <br /> t tactic for completing our engineering tasks. <br /> The overall organization that is employed to attack a given <br /> .a • - engineering task revolves around the first step which is the <br /> �� "Strategy". It is during this initial and critical phase that we <br /> 1 .� assess the scope of work and apply the appropriate resources <br /> N" J for its successful and timely completion. Through the years, <br /> 1 _ raes: {s T GB&A has been able to amass a pool of talent that are both <br /> full-time employees as well as hired consultants. <br /> Whatever the project may be. GB&A will always remain at the main point of contact and will be <br /> 1 intimately involved in all the aspects of the project even if he assigns one of his Project Managers to <br /> some of the minor tasks. <br /> 1 <br /> CITY OF SUNNY ISLES BEACH <br /> RFQ NO. 12-04-02 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.