My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G. Batista - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
G. Batista
>
G. Batista - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 3:39:53 PM
Creation date
2/5/2016 3:39:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' CR G. BAIISTA <br /> &ASSOCIATES <br /> © <br /> I <br /> NW 146th STREET/N. MIAMI AVENUE/S. RIVER DRIVE - <br /> I ROUNDABOUT <br /> Miami-Dade County, Florida <br /> IRJ Behar prepared the layout and final construction plans for a roundabout for Miami-Dade County Public <br /> Works, in the City of North Miami. The roundabout connects North Miami Avenue, South River Drive and NW <br /> 146th Street. The purpose of the project was to provide traffic calming in this neighborhood. The preparation of <br /> I <br /> the roundabout was based on Miami-Dade County Roadway Design Criteria. <br /> Client <br /> I Miami-Dade County Public Works <br /> Traffic Engineering Division <br /> 111 NW 1st Street, Suite 1510 <br /> ' Miami,FL 33128 <br /> Mr.Muhammed Hasan,PE <br /> Tel:(305)375-2378 <br /> IRJ Behar's Role . <br /> Traffic study,traffic counts, - -r .• — <br /> signalization plans,utility coordination, . i �� - , . <br /> i^ <br /> ' and roundabout design services - + l'j- . :.\ <br /> Project Started: 2005 t`3` . t �..l. s u • <br /> -71 <br /> ' Project Completed: 2006 . — i <br /> Value of Design Services: $50,000 1 � -dri a " ~ <br /> a <br /> Construction Cost: $250,000 <br /> I RJ Behar's Key Personnel i _ <br /> Robert J. Behar, PE - <br /> Project Manager ttee ,r.`;•` . , i <br /> Nanette Akyaz <br /> Designer <br /> Israel Magrisso,PE <br /> I <br /> Utility Coordination <br /> I <br /> I <br /> I <br /> ' CITY OF SUNNY ISLES BEACH <br /> RFQ NO. 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.