My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G. Batista - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
G. Batista
>
G. Batista - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 3:39:53 PM
Creation date
2/5/2016 3:39:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> G. BAnSTA <br /> L, &ASSOCIATES <br /> © <br /> I <br /> PEMBROKE ROAD (FROM SW 160th AVE. TO SW 136th AVE.) <br /> I TRAFFIC STUDY <br /> BROWARD COUNTY, FLORIDA <br /> I RJ Behar was requested to perform an intersection capacity analysis to project the operating conditions for the <br /> intersections of Pembroke Road with NW 160 Avenue (Dykes Road), NW 145"Avenue and NW 136th Avenue; <br /> once the proposed segment of Pembroke Road between NW 136th Avenue and Dykes Road is opened. This <br /> new segment of Pembroke Road will be a four-lane divided urban arterial and will bridge over 1-75. Additionally, <br /> I <br /> the study analyzed these intersections to determine if traffic signals would be warranted based on projected <br /> traffic. The operating condition 10 years(2015)after the opening of the roadway segment was also evaluated. <br /> I Client <br /> Broward County Highway 8 Engineering Division <br /> 1 N.University Drive,Suite 300 B . __. <br /> I Plantation,FL 33324 - <br /> Mr.Wilf Stride,PE • <br /> Tel:(954)5774559 � <br /> I RJ Behar's RoleI <br /> Traffic study,assessment of theii <br /> intersection,intersection capacity, ._ ' <br /> operation analysis,safety analysis and ' � <br /> I <br /> traffic projections • �� I e •' d • . ` <br /> z <br /> I <br /> Project Started: 2004 - <br /> Value of <br /> ProCompleted: ice <br /> Design Services:530,000 ` <br /> Construction Cost$8,200,000 —`' j <br /> ' RJ Behar's Key Personnel <br /> Robert J. Behar,PE <br /> Principal in Charge �c•/ <br /> Javier Rodriguez,PE <br /> I <br /> Project Manager <br /> Claudia M.Lamus,MS, El <br /> Traffic Engineer - <br /> I <br /> I <br /> I <br /> CITY OF SUNNY ISLES BEACH <br /> RFQ NO. 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.