My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J. Bonfill
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
J. Bonfill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 4:00:38 PM
Creation date
2/5/2016 4:00:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I J Bonfill&Associates <br /> RFQ#12-04-02 Page 15 <br />.' F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects, if not specified. 5 <br /> Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2002 <br /> I Service and Maintenance Facility for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(Irappacade) <br /> 16250 W. Dixie Highway North Miami Beach, Florida 2000-2002 2002 <br /> 23. PROJECT OWNER'S INFORMATION <br /> Ia.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> Friendly Ford Tom Strickland, Suncoast Autobuilders 727-561-0764 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope.size,and cost) <br /> IA 4 year project that renovated the entire 20-Acre facility consisting of: <br /> Parts 8 Services Building Renovation: <br /> A 62,000 S.F. Office Renovation and Parts Storage Expansion with new Retail Parts Store. <br /> Conversion of existing Body Shop to new Service Facility <br /> New Service Drive Canopy <br /> Structural Improvements and Re-roofing to Existing Roof Top Parking 50,000 S.F. <br /> INew Body Shop. 16 Bays 8 Offices. 11,400 S.F. <br /> I New Prep Building:8 Bays and Overnight Parts Receiving.4,500 S.F. <br /> Services included: <br /> Architectural, Structural,Mechanical, Electrical, Plumbing,Civil Engineering, Surveying, Environmental Impact Studies. <br /> Site Development including Zoning Variances and DERM Variances. <br /> I Deliverables and Services included: <br /> Boundary Survey,As Built of existing conditions <br /> Design proposed changes <br /> I Equipment and Building Component Selection and Specification <br /> Production of construction documents for proposed improvements <br /> Coordination with Engineering Consultants <br /> Construction Sequencing <br /> I Permitting <br /> Construction Administration: Inspections, Contract Close-out, Punch list, Final As-Built <br /> Construction Cost: 54,600,000 <br /> I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. <br /> 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> b. <br /> 1 (1)FIRM NAME , (2)FIRM LOCATION(City and State) (3)ROLE <br /> C. <br /> I <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> d. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE . <br /> I e. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> 1 ( <br /> I■, AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 11 <br /> MANDATORY USE DATE OF FORM 612004 <br /> • <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.